
HOISTS
MLC150-1 SERVICE/MAINTENANCE MANUAL
5-38
Published 03-21-2021, Control # 264-01
Maintenance
Inspect and test the block-up limits
weekly or every 40
hours of operation
, as follows:
1.
Lower the boom (and the jib, if equipped) onto blocking
at ground level.
2.
Carefully inspect the following items:
a.
Inspect each weight for freedom of movement on
the load line.
b.
Inspect each weight, chain, shackle and connecting
pin for excessive or abnormal wear. Make sure the
cotter pins for the shackles are installed and spread.
c.
Inspect the entire length of each electric cable for
damage.
FIGURE 5-24
Item
Description
1
Limit Switch
2
Actuator Cable
3
Chain with Shackles and Pins
4
Weight with Chain and Links
Lower Boom Point Shown. Typical at:
•
Lower Boom Point 2nd A2B
•
Upper Boom Point
CAUTION
Prevent Damage!
If inspection reveals a problem with the block-up limit
components, do not operate the crane until the block-up
limit has been repaired to proper working order.
REFERENCE
ONLY
Summary of Contents for MLC150-1
Page 1: ...Service Maintenance Manual Manitowoc MLC150 1 R E F E R E N C E O N L Y ...
Page 2: ...R E F E R E N C E O N L Y ...
Page 4: ...THE ORIGINAL LANGUAGE OF THIS PUBLICATION IS ENGLISH R E F E R E N C E O N L Y ...
Page 205: ...R E F E R E N C E O N L Y ...
Page 206: ...R E F E R E N C E O N L Y ...