
Section 2
Installation Instructions
Part Number 000008463 10/11
9
5. Route line voltage wires (Black & White) through line
voltage Heyco fitting and attach to L1 and L2
contactor terminals.
NOTE: Three phase models do not have open terminals
on contactor. Remove two wires from contactor, install
supplied electrical connector and connect wires.
6. Route LuminIce™ hoses to evaporator and attach.
•
Insert hose closest to the front of the ice machine in
the bottom evaporator bulkhead hole.
•
Insert hose farthest from the front of the ice machine
in the upper evaporator bulkhead hole.
7. Install the evaporator dust cover and test run the ice
machine and LuminIce™. The Luminice™ is
energized whenever power is applied to the ice
machine.
Route Through Line Voltage Heyco
and
Attach to Contactor Terminals
LuminIce Power
L1
N
Ice Machine Power
Incoming Power Supply