Crane operation
11.5 Crane operation with main boom
11 - 88
3 302 709 en
Operating manual
GMK5150L
1
2
.0
1.
201
8
Switching off the
derricking gear
If the derricking gear is not required, it should be switched off to avoid unin-
tentional use.
•
Press the button (
1
) once.
– The lamp in the button (
1
) will light up dimly.
– Symbol (
2
) will be
red
if the derricking gear is switched off.
If the control lever is assigned more than one function, the derricking gear
will also be switched off if you switch on another power unit which is
assigned to the same control lever movement;
Lowering the
main boom to
a horizontal
position
The main boom can be set down by referring to the working curves within
the working range specified in the
Lifting capacity tables
.
This section supplements the information (
1
) in the
Lifting capacity tables
supplied for the main boom intermediate lengths.
To prevent any overloading of the derricking cylinder, the derricking
cylinder pressure is also monitored here.
In area (
Z
) of the main boom intermediate
lengths it can be the case, particularly with
main boom angles below 15°, that loads spec-
ified in the
Lifting capacity table
are not reached
for shorter main boom lengths.
In this case the RCL shows the reduced maximum load bearing capacity on
the
Maximum load
display.
The RCL continuously calculates this value while taking the derricking cylin-
der pressure into account. If the current load is too big, the RCL shuts down;
Summary of Contents for GROVE GMK5150L
Page 1: ...Operating manual 3 302 709 en 12 01 2018 ...
Page 6: ...12 01 2018 2 3 302 706 en Additional page GMK Blank page ...
Page 8: ...31 08 2018 2 3 302 808 en Additional pages GMK Blank page ...
Page 12: ...22 11 2018 4 3 302 834 en us Correction sheet GMK5150 GMK5150L Blank page ...
Page 14: ...28 11 2018 2 3 302 839 en Additional pages GMK Blank page ...
Page 16: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 18: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 20: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 24: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 30: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 32: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 36: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 42: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 45: ...Operating manual 3 302 709 en GMK5150L 12 01 2018 15 15 Index ...
Page 46: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Page 48: ...Overview 1 1 Accidents 1 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Page 50: ...Overview 1 4 Terms used 1 4 3 302 709 en Operating manual GMK5150L 12 01 2018 1 4 Terms used ...
Page 52: ...Overview 1 4 Terms used 1 6 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Page 1020: ...Index 15 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Page 1039: ......
Page 1040: ......