![Manitowoc Grove GMK 4100L-1 Maintenance Manual Download Page 73](http://html.mh-extra.com/html/manitowoc/grove-gmk-4100l-1/grove-gmk-4100l-1_maintenance-manual_701181073.webp)
Maintenance overview
5.4 Measures required for winch monitoring
2
5
.1
1.
201
6
Maintenance manual
3 302 364 en
5 - 25
GMK 4100L-1
The general overhaul is to be arranged by the operator and performed by
the manufacturer or a representative authorised by the manufacturer.
The results are to be entered in the crane logbook.
The manufacturer or an authorised representative will specify a new
theoretical service life D upon completion of the general overhaul.
The next general overhaul must be performed within 10 years at the latest.
Alternative
provision
If after 10 years the theoretical service life has not been used up the winch
can continue to be operated without a general overhaul under the following
conditions:
The crane inspector has confirmed that the used proportion of the service
life is correct and proper by signing his/her name in the crane logbook after
every expert inspection.
In this case the crane inspector must closely inspect the winch. This includes
at least:
– a visual examination of the exterior (for leaks, damage, deformation etc.)
– an oil inspection (especially for metallic residues)
– a load inspection with minimum and maximum rope pull and each at
maximum possible speed At least one layer must be wound. Investigate
any unusual noises during the load inspection.
This inspection must be confirmed in the crane logbook by the approved
crane inspector and there must be a statement on continued operation for
the winch. The next inspection must take place before the end of the 12th
year of operation and must be repeated every year thereafter.
Summary of Contents for Grove GMK 4100L-1
Page 1: ...Maintenance manual 3 302 364 en 25 11 2016 ...
Page 4: ...24 04 2017 2 3 302 584 en Additional pages for maintenance manual GMK 4100L 1 Blank page ...
Page 12: ...24 04 2017 10 3 302 584 en Additional pages for maintenance manual GMK 4100L 1 Blank page ...
Page 16: ...11 01 2018 2 3 302 704 en Additional page GMK truck cranes Blank page ...
Page 18: ...03 09 2018 2 3 302 809 en Additional pages for maintenance manual GMK truck cranes Blank page ...
Page 20: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 Blank page ...
Page 22: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 30: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 38: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 43: ...25 11 2016 4 Maintenance manual 3 302 364 en GMK 4100L 1 4 Run in regulations ...
Page 44: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 48: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 78: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 88: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 323: ...25 11 2016 9 Maintenance manual 3 302 364 en GMK 4100L 1 9 Longer out of service periods ...
Page 324: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 328: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 332: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 343: ...25 11 2016 Maintenance manual 3 302 364 en GMK 4100L 1 Appendix ...
Page 344: ...25 11 2016 3 302 364 en Maintenancemanual GMK 4100L 1 ...
Page 345: ...Appendix ...
Page 346: ......
Page 348: ......
Page 350: ......
Page 352: ......
Page 354: ......
Page 355: ......
Page 356: ......