35
MARA PIGGYBACK SERVICE MANUAL
19
Pressureize air can to 125
psi. Recharge IFP to 300 psi if
previously released. Replace
the dust caps on the Reservoir
and mair chamber. Install
bottom out O-ring on the
damper body.
20
bleed and fill
Refer to Mara Set-up guide for
air can pressure.(See Below)