background image

Fire damper - FDMQ 120

Page 6

Version 2023-03-07

TPM 162/22

Design with spring return actuator

The fire dampers are equipped with Belimo spring return
actuators with thermoelectric activation device BAT. The
spring return actuator types are BFL, BFN or BF depending
on the damper size. (Further mentioned as „actuator“).

After  being  connected  to  power  supply  230V  or  AC/DC
24V,  the  actuator  rotates  the  damper  blade  to  the
operating  position  "OPEN"  and  at  the  same  time  pre-
stretches its return spring.

When the actuator is power supplied, the damper blade is
in  the  position  "OPEN"  and  the  return  spring  is  pre-
stretched.

Time needed for full opening of the damper blade from
the position "CLOSED" to the position "OPEN" is maximum
120 sec. If the actuator power supply is interrupted (due
to loss of supply voltage, or pressing a test button on the
thermoelectric  activation  device  BAT),  the  actuator
rotates  the  damper  blade  to  the  breakdown  position
"CLOSED".

The  time  of  closing  the  damper  blade  from  the  position
"OPEN" to the position "CLOSED" takes maximum 20 sec.

In case that the power supply is restored again (the blade
can be in any position), the actuator starts to rotate the
damper blade back to the position "OPEN".

A  thermoelectric  activation  device  BAT,  which  contains
two thermal fuses Tf1 and Tf2, is an integral part of the
actuator.

These  fuses  are  activated  when  temperature  +72°C  has
been  reached  (the  fuse  Tf1  due  to  temperature  outside
the duct and the fuse Tf2 due to temperature inside the
duct).  The  thermoelectric  activation  device  can  also  be
equipped with a Tf2 thermal fuse type ZBAT 95/120/140
(must be specified in the order). In this case, the activation
temperature  inside  the  duct  is  +95°C,  +120°C  or  +140°C
(depending on the type).

After the thermal fuse Tf1 or Tf2 has been activated, the
power supply is permanently and irreversibly interrupted
and  the  actuator,  by  means  of  the  pre-stretched  spring,
rotates  the  damper  blade  into  the  breakdown  position
"CLOSED".

Signalisation  of  damper  blade  position  "OPEN"  and
"CLOSE" is provided by two microswitches.

Design .40 and .50

Design .40 and .50

Spring return actuator

Thermoelectric
activation device BAT

Summary of Contents for FDMQ 120

Page 1: ...b sk 550 267 24 Hostomice Czech Republic Tel 420 311 706 742 E Mail mandik mandik cz FDMQ 120 Fire damper Technical Documentation Installation Commissioning Operation Maintenance and Service Manual TP...

Page 2: ...and Installation 27 Statement of installations 29 Installation in solid wall construction 30 Installation outside solid wall construction 34 Installation in gypsum wall construction 36 Installation o...

Page 3: ...structions Damper blade automatically closes air duct using a closing spring or a spring return actuator The closing spring is actuated by pressing a button on the manual control or by melting a therm...

Page 4: ...tivation temperature 72 C has been reached Automatic initiation of the manual control is not activated if the temperature does not exceed 70 C In case that other activation temperatures are required t...

Page 5: ...of protection IP 67 Working temperature 25 C 120 C Limit switch G905 300E03W1 This limit switch is possible to connect in two following ways CUT OFF if the arm is moving connect wire 1 2 SWITCH ON if...

Page 6: ...per blade from the position OPEN to the position CLOSED takes maximum 20 sec In case that the power supply is restored again the blade can be in any position the actuator starts to rotate the damper b...

Page 7: ...A 5 ms Protection class II III Degree of protection IP 54 Running time motor spring return 60 s 20 s Ambient temperature normal duty safety duty non operating temperature 30 C 55 C The safe position...

Page 8: ...I III Degree of protection IP 54 Running time motor spring return 60 s 20 s Ambient temperature normal duty safety duty non operating temperature 30 C 55 C The safe position will be attained up to max...

Page 9: ...III Degree of protection IP 54 Running time motor spring return 120 s 16 s Ambient temperature normal duty safety duty non operating temperature 30 C 50 C The safe position will be attained up to max...

Page 10: ...s interrupted due to temperature outside the duct it is necessary to replace the spring return actuator Thermoelectric activation device BAT is integral part of the actuator If the thermal fuse Tf2 is...

Page 11: ...nd 51 Design 41 with actuator BF 24 TN BFL BFN 24 T with smoke detector ORS 142 K and with supply device BKN 230 24 MOD voltage AC 230 V 1 2 3 4 5 6 7 1 2 S2 S1 S3 S5 S4 S6 2 3 4 5 6 1 BAT Tf Tf LED C...

Page 12: ...ator is supposed to be controlled without any signal from the central it can be switched on by means of a bridge between the terminals 3 and 4 A green LED on BKN 230 24 is on when voltage is present i...

Page 13: ...TION and FAILURE through 2 conductor wiring to the central Control command SWITCHED ON SWITCHED OFF from the central through BKN 230 24 C MP goes through the same wiring to the actuator To simplify th...

Page 14: ...ith control systems using the Modbus RTU or BACnet MS TP protocol and smoke detector ORS 142 K The wiring of the line is to be carried out in accordance with applicable RS485 regulations Parameterizat...

Page 15: ...with an external smoke detector Design 62 Communication and supply device BKN 230 24MP Nominal voltage AC 230 V 50 60Hz Power consumption 8 W including actuator Dimensioning 10 VA including actuator P...

Page 16: ...d the safety relay opens and stays in this state even if the smoke disappears from the scanning chamber The sensor remains in the alarm state until the power supply is briefly reset On the pin 3 an ex...

Page 17: ...ontrol and checks of fire dampers with the BF 24 TN ST BFL 24 T ST BFN 24 T ST actuator in conjunction with the BKN 230 24 supply and communication device BKS 24 1B receives information about the situ...

Page 18: ...ts of the connected fire dampers It is possible to signalise functions such as the damper position and failure reports or to transmit them further to the system by means of integrated auxiliary switch...

Page 19: ...casing 2 Spring return actuator 3 Damper blade 4 Inspection opening cover 5 Thermoelectric activation device BAT 6 Hole for camera FDMQ 120 with manual control 1 Damper casing 2 Manual control 3 Damp...

Page 20: ...sing by the value a or c These values are specified in chapter Technical parameters see pages 21 to 26 Values a and c has to be respected when projecting following air conditioning duct Flange of a da...

Page 21: ...13 0 0364 700 28 273 21 22 5 0 1270 315 80 5 12 13 5 0 0388 710 33 278 21 22 5 0 1290 355 100 5 13 14 5 0 0450 750 53 298 22 23 5 0 1370 400 123 14 15 5 0 0519 800 78 323 23 24 5 0 1470 450 148 15 16...

Page 22: ...5 100 5 15 5 17 5 0 0798 800 78 323 29 32 0 2426 BF 400 123 17 18 5 0 0921 400 x 150 12 6 12 7 0 0319 BFL M1 450 148 18 21 0 1059 180 13 13 5 15 5 0 0431 500 173 19 5 22 5 0 1196 M2 200 23 14 15 5 0 0...

Page 23: ...5 19 5 0 0661 500 173 25 5 28 5 0 2066 200 23 18 20 5 0 0776 550 198 27 30 0 2304 BFN 225 36 18 5 21 5 0 0920 560 203 27 30 0 2351 250 48 19 22 0 1064 600 223 28 5 31 5 0 2541 280 63 20 23 0 1236 630...

Page 24: ...23 25 5 0 1341 600 223 36 39 0 3344 280 63 24 27 0 1559 M2 630 238 37 40 0 3531 300 73 24 5 27 5 0 1704 650 3 248 38 41 0 3656 315 80 5 25 28 0 1813 700 28 273 40 43 0 3969 355 100 5 26 5 29 5 0 2103...

Page 25: ...273 47 50 0 5556 450 148 49 52 0 4716 BF M3 710 33 278 47 50 0 5644 500 173 47 5 50 5 0 5329 750 53 298 49 52 0 5994 550 198 50 5 53 5 0 5941 800 78 323 51 5 54 5 0 6431 M4 560 203 51 5 54 5 0 6064 10...

Page 26: ...39 0 1991 550 198 58 5 61 5 0 7154 225 36 39 5 41 0 2360 560 203 59 5 62 5 0 7301 250 48 41 5 43 0 2729 BFN 600 223 62 5 65 5 0 7891 M4 280 63 44 45 5 0 3171 630 238 64 67 0 8334 M5 300 73 45 5 48 5 0...

Page 27: ...llation and plastering process the actuating mechanism must be protected covered against damage and pollution The damper casing should not be deformed during bricking in Once the damper is built in th...

Page 28: ...protected with fire fighting insulation If damper is installed outside a construction it is necessary to use reinforcing frame VRM Q 120 see page 57 Examples of fire damper installation X Built in ed...

Page 29: ...0 ve i o S 30 Battery mortar or gypsum 31 32 Weichschott 33 Outside solid wall construction ISOVER Ultimate Protect Weichschott 34 35 In gypsum wall construction Mortar or gypsum 36 Battery mortar or...

Page 30: ...Fixing profile with threaded rod see pages 45 to 48 5 Duct Solid wall construction mortar or gypsum EIS 120 X X 100 50 150 50 150 100 B min B 100 max B 300 A min A 100 max A 300 For connection followi...

Page 31: ...te Protect SLAB 4 th 60 mm Solid wall construction 2 battery mortar or gypsum EIS 120 X Y 50 150 50 150 Y X 100 100 B min B 100 max B 300 2xA 60 min 2xA 60 100 max 2xA 60 300 min 2xB 60 100 max 2xB 60...

Page 32: ...kg m e g ISOVER Ultimate Protect SLAB 4 th 60 mm 63 12 A B 29 X 100 Solid wall construction 4 battery mortar or gypsum EIS 120 X 50 150 min 2xA 60 100 max 2xA 60 300 2xA 60 B min 2xB 60 100 max 2xB 6...

Page 33: ...equivalent 5 Duct 6 Protective cladding boards not part of the damper but must be used as part of the penetration filling It can be ordered from MAND K as an accessory e g PROMATECT MST th 30 mm min d...

Page 34: ...ed separately for each installation case see page 57 Outside solid wall construction ISOVER Ultimate Protect Weichschott EIS 120 1 FDMQ 120 2 Solid wall construction 3 Weichschott e g Firestop Board H...

Page 35: ...ER Protect BSK glue apply on the insulation and stick it to the fire separation construction 8 Fire resistant mastic fill the gap on both sides of the fire separation construction and around the perim...

Page 36: ...s 45 to 48 5 Duct X X 100 50 150 Installation in gypsum wall construction Gypsum wall construction mortar or gypsum EIS 120 B min B 100 max B 300 A min A 100 max A 300 50 150 100 For connection follow...

Page 37: ...te Protect SLAB 4 th 60 mm Gypsum wall construction 2 battery mortar or gypsum EIS 120 X Y 50 150 50 150 Y 100 min 2xB 60 100 max 2xB 60 300 2xB 60 A A min A 100 max A 300 A A A B C 100 50 150 B C X B...

Page 38: ...kg m e g ISOVER Ultimate Protect SLAB 4 th 60 mm 63 12 A B 29 X 100 Gypsum wall construction 4 battery mortar or gypsum EIS 120 X 50 150 A A min 2xA 60 100 max 2xA 60 300 2xA 60 B min 2xB 60 100 max...

Page 39: ...C or equivalent 5 Duct 6 Protective cladding boards not part of the damper but must be used as part of the penetration filling It can be ordered from MAND K as an accessory e g PROMATECT MST th 30 mm...

Page 40: ...of installation VRM Q 120 is not a part of the fire damper and must be ordered separately for each installation case see page 57 1 FDMQ 120 2 Gypsum wall construction 3 Weichschott e g Firestop Board...

Page 41: ...BSK glue apply on the insulation and stick it to the fire separation construction 8 Fire resistant mastic fill the gap on both sides of the fire separation construction and around the perimeter of pen...

Page 42: ...to 48 5 Duct Installation in solid ceiling construction Solid ceiling construction mortar or gypsum EIS 120 X X 150 70 150 For connection following duct see page 49 This installation was tested withou...

Page 43: ...with Gy proc CoreBoard between studs secured by Gypframe Retaining Channel 25mm Isover Acoustic Partition Roll APR 1200 in cavity optional Lining boards to non shaft side see table below Studs at 600m...

Page 44: ...gypsum EIS 120 For connection following duct see page 49 Follow the instructions of the shaft wall producer All technical specifications and conditions can be found at www british gypsum com Maximum s...

Page 45: ...7 96 192 M18 192 117 234 M20 245 150 300 Without anchor With anchor Examples of anchoring to the ceiling construction Follow the instructions of fixing specialist or installation company With hinge pl...

Page 46: ...20 2 Threaded rod M8 M20 3 Support HILTI MQ 41 or MQ 41 3 or equivalent 4 Bored plate HILTI MQZ L or equivalent 5 Washer for M8 M20 6 Nut M8 M20 max 50 Dimension elements of the suspension system acc...

Page 47: ...ickness 2 mm and min width 60 mm 8 Nut M8 with anchor 9 Screw with hexagon head 10 Installation holes 11 M6 bolt assembly bolt M6x10 nut M6 12 Gypsum grid from U profile Example of fixing FDMQ 120 to...

Page 48: ...NDIK a s or sheet metal min thickness 2 mm and min width 60 mm 7 Nut M8 with anchor 8 Installation holes 9 M6 bolt assembly bolt M6x10 nut M6 Example of fixing FDMQ 120 to the ceiling In solid ceiling...

Page 49: ...onductive connection 1 FDMQ 120 2 Duct 3 Extension piece if required 4 Damping pad 5 Steel clamp min M8 bolts 6 M8 bolt assembly bolt M8x20 mm 2 pcs large washer M8 nut M8 7 Seal 8 Lock washers M8 9 E...

Page 50: ...DATA Pressure loss Pressure loss calculation Determination of pressure loss by using diagram 1 2 kg m3 p w2 2 p Pa presure loss w m s air flow speed in nominal damper section kg m3 air density coeffi...

Page 51: ...9 0 219 750 0 354 0 330 0 321 0 309 0 286 0 271 0 260 0 246 0 238 0 230 0 222 0 219 0 215 800 0 344 0 320 0 309 0 297 0 282 0 264 0 251 0 239 0 229 0 221 0 215 0 211 0 209 A B 600 630 650 700 710 750...

Page 52: ...44 1 47 3 49 5 51 3 52 7 53 9 54 9 55 8 56 6 59 8 62 63 8 65 2 67 4 69 2 72 8 74 5 7 48 2 51 3 53 5 55 3 56 7 57 9 58 9 59 8 60 7 63 8 66 1 67 8 69 2 71 4 73 2 76 8 78 6 8 51 6 54 8 57 58 8 60 2 61 4...

Page 53: ...ock holder 1 lock lever 2 closing spring 8 dia stopper pin manual control pin 5 Inspection opening cover including the stirrup and fasteners if they are parts of the cover 6 Bearing for torque transfe...

Page 54: ...hout direct weather impact there must not occur any shocks and ambient temperature must not exceed 50 C Dampers must be protected against impact when transported and manipulated During transportation...

Page 55: ...rks done on the fire dampers must be done according international and local norms and laws All effective safety standards and directives must be obse rved during damper assembly To ensure reliable dam...

Page 56: ...22 1 Damper 6 Thermal fuse 2 Mounting plate 7 Manual control 3 Sealing cover 8 Actuator 4 Sealing of a mounting plate 9 Thermoelectric activation device BAT 5 Mounting plate cover 10 Sensor sticker C...

Page 57: ...8x60 mm hexagon head screws DIN 931 with M8 8 4 washers DIN 7349 3 Screw 5x60 mm screws into the predrilled holes 1 FDMQ 120 2 Part A of VRM Q 120 3 Part B of VRM Q 120 4 Hexagon head screw M8x60 mm D...

Page 58: ...be achieved manually or automatically by applying the supply voltage It is recommended to provide periodical checks maintenance and service actions on fire equipment by authorized persons The authoriz...

Page 59: ...s a part of function checks of the fire dampers at least 1x a year For the function checks the damper blade should be in CLOSED position with the fan off or with closed air regulation situated between...

Page 60: ...41 With actuator BF 24 TN BFL BFN 24 T voltage AC DC 24 V 50 With actuator BF 24 TN BFL BFN 24 T with smoke detector ORS 142 K voltage AC DC 24 V 51 With communication and supply device BKN 230 24 an...

Page 61: ...m The producer reserves the right for innovations of the product For actual product information see www mandik com MAND K a s Dob sk 550 267 24 Hostomice Czech Republic Tel 420 311 706 742 E Mail mand...

Reviews: