background image

20

Used materials - example:***

4

Rockwool Conlit Ductrock EIS 90, th. 60 mm

** Around the perimeter

* min. 110 - Concrete/ min. 125 - Aerated concrete

60

75**

120

*

*** 

Stuffing  box,  fire  protection  mastic,  cement  lime  plate  and
insulation  materials  can  be  replaced  by  another  approved  fire
sealing system for damper installation with equivalent material
properties.

**** 

Depends on the distance of the flap from the construction, when
the  maximum  distance  from  the  construct  is  not  limited  and
according  to  EN  15882-2  must  use  the  required  number  of
hinges according to EN 1366-1:2014.

*****    Reinforcement fixing VRM
 

Installation of profile U25x40x25

******   When using Rockwool Conlit Ductrock EIS 120, th. 60 mm, the

overall fire resistance of the EIS 120 can be achieved.

T  - 

thickness of the insulation (mm)

Position:

1

Fire damper

2

Solid ceiling construction

3

Mortar or gypsum

4

Stone wool bound with use of an organic resin with

crushed stone as a refrigerant, min. density 300 kg/m³

and min. thickness 60 mm

5

Profil U25x40x25

6

VRM*****

7

Duct

L=Min. 100
T=120

L=variabel****
T=60

L=Min. 400
T=120

Summary of Contents for FDMB

Page 1: ......

Page 2: ...eral stone wool min density 140 kg m 4 Fire protection mastic min thickness 1 mm 5 Duct Used materials example 3 Promapyr Rockwool Steprock HD Hilti CFS CT B 1S 140 50 4 Promastop P K Hilti CFS CT 75...

Page 3: ...rials example 3 HILTI CFS F FX EIS 60 PROMAFOAM C EIS 45 SOUDAL Soudafoam FR B1 EIS 30 DenBraven Fire protection foam EIS 30 Position 1 Fire damper 2 Solid wall construction 3 Fire protection foam 4 S...

Page 4: ...n density 140 kg m 4 Fire protection mastic min thickness 1 mm 5 Cement lime plate min thickness 15 mm min density 870 kg m 6 Duct 100 Screws has to be fixed in wall ceiling construction If it is need...

Page 5: ...5 100 100 Position 1 Fire damper 2 Installation frame 3 Solid wall construction 100...

Page 6: ...terials example 3 Hilti CFS CT B 1S 140 50 4 Hilti CFS CT Position 1 Fire damper 2 Solid wall construction 3 Fire resistant board 4 Fire stop coating thickness 1 mm 5 Duct D 60 to 800 max 2050 D 60 to...

Page 7: ...not limited 100 80 80 100 Insulation materials can be replaced by another approved fire sealing system with equivalent properties The maximum distance of the fire damper from the structure is not lim...

Page 8: ...s Depends on the distance of the flap from the construction when the maximum distance from the construct is not limited and according to EN 15882 2 must use the required number of hinges according to...

Page 9: ...5 Promastop P K Hilti CFS CT Installation opening has to be reinforced by steel U profile Profile is fixed by screws 3 5 mm with corre sponding length Distance between screws 200 mm 100 75 Position 1...

Page 10: ...re protection foam EIS 30 Position 1 Fire damper 2 Gypsum plate 3 Mineral wool type depending on the type of construction 4 Fire protection foam 5 Stucco plaster 6 Duct Installation opening has to be...

Page 11: ...n density 870 kg m 7 Duct Around the perimeter 300 300 25 25 Screw min 4x50 Screws has to be fixed in wall ceiling construction If it is needed use steel bracket Used materials example 4 Promapyr Rock...

Page 12: ...ofile is fixed by screws 3 5 mm with corre sponding length Distance between screws 200 mm Installation opening has to be reinforced by steel U profile Profile is fixed by screws 3 5 mm with corre spon...

Page 13: ...t board 5 Fire stop coating thickness 1 mm 6 Duct D 60 to 800 max 2050 D 60 to 800 max 1650 Used materials example 3 Hilti CFS CT B 1S 140 50 4 Hilti CFS CT 100 Installation opening has to be reinforc...

Page 14: ...80 mm ALU1 Position 1 Fire damper 2 Gypsum plate 3 Mineral wool type depending on the type of construction 4 Stuffing box mineral stone wool min density 140 kg m 5 Fire protection mastic min thickness...

Page 15: ...materials can be replaced by another approved fire sealing system for damper installation with equivalent material properties Depends on the distance of the flap from the construction when the maximu...

Page 16: ...tic min thickness 1 mm 5 Duct Around the perimeter min 110 Concrete min 125 Aerated concrete Used materials example 3 Promapyr Rockwool Steprock HD Hilti CFS CT B 1S 140 50 4 Promastop P K Hilti CFS C...

Page 17: ...ol Steprock HD Hilti CFS CT B 1S 140 50 4 Promastop P K Hilti CFS CT 5 Promatect H Position 1 Fire damper 2 Solid ceiling construction 3 Stuffing box mineral stone wool min density 140 kg m 4 Fire pro...

Page 18: ...18 min 110 Concrete min 125 Aerated concrete Position 1 Fire damper 2 Installation frame 3 Solid ceiling construction...

Page 19: ...ncrete min 125 Aerated concrete Position 1 Fire damper 2 Solid ceiling construction 3 Fire resistant board 4 Fire stop coating thickness 1 mm 5 Duct Used materials example 3 Hilti CFS CT B 1S 140 50 4...

Page 20: ...nce from the construct is not limited and according to EN 15882 2 must use the required number of hinges according to EN 1366 1 2014 Reinforcement fixing VRM Installation of profile U25x40x25 When usi...

Page 21: ...21 30 100 75 750 Position 1 Fire damper 2 Solid ceiling construction 3 Concrete B20 4 Rebar 5 Duct Around the perimeter min 110 Concrete min 125 Aerated concrete 100 100...

Page 22: ...to be done on each corner of VRM For dampers with A 800 and damper placement outside wall construction is necessary to use reinforcement VRM 35 Screw 4 2x50 max 350 100 1 Cut the groove for profil U25...

Page 23: ...500x400 X 36 AxB 500x400 123 110 B B 60 A A 60 375 B X B 60 A X A 60 60 X 2 60 X 2 37 5 Position 1 Damper casing 2 Actuating mechanism 3 Damper blade 4 Inspection hole covering 5 BAT thermoelectrical...

Page 24: ...24 1 Damper 2 Mounting plate 3 Sealing cover 4 Seal plates 5 Mounting plate cover 6 Thermal fuse 7 Mechanics 8 Actuator 9 Temperature sensor 10 Sensor sticker...

Page 25: ...re the distance between the adjacent dampers must be at least 200 mm The damper blade in its closed position must be inside of the fire separating structure The fire damper may also be installed outsi...

Page 26: ...from the damper control parts At least one inspection hole must be accessible The damper body must not get deformed during its installation process Once the damper is built installed its blade must n...

Page 27: ...of dampers c a 16 5 30 16 5 10 2 0 10 20 10 8 5 10 10 8 5 20 X 2 16 5 30 X 2 16 5 10 2 0 X 23 AxB 500x400 X 36 AxB 500x400 140 165 190 5 215 15 220 20 240 30 255 40 265 52 5 290 65 295 80 15 315 90 4...

Page 28: ...ED 1 2 S3 S1 S2 S5 S4 S6 N L1 5 80 BAT Tf Tf LED AC 230V 5A IP 67 25 C 120 C 1 COM black wire 2 NC gray wire 4 NO blue wire This limit switch is possible to connect in following two versions a if the...

Page 29: ...pers body with four screws M6 Removing the thermal fuse from the fuse holder of initiation device check its correct functionality The mechanism is identified as M1 to M4 depending on the closing sprin...

Page 30: ...stos free fire resistant mineral fibre boards The damper control devices are made of galvanized materials alternatively of stainless steel without any additional surface finish The springs are galvani...

Page 31: ...reserves the right for innovations of the product For actual product information see www mandik com MAND K a s Dob sk 550 26724 Hostomice Czech Republic Tel 420 311 706 706 E Mail mandik mandik cz ww...

Reviews: