69
150*
≥
100
* min. 110 - Concrete/ min. 125 - Aerated concrete
>100
≥
125
≥
125
≥ 50
≥
100
Dimensions
Number
ZB1
Number
ZH1
A,B ≤ 400
1
1
400 <
A,B ≤ 800
2
2
800 <
B ≤ 1200
3
3
1200 <
B ≤ 1500
4
4
It is possible to use
corresponding number of
holes and screws
Installation opening has to be
reinforced by profile (UW, CW).
Profil is fixed by screws ≥3,5 mm
with corresponding length. Distance
between screws ≤200 mm.
Installation frame E1 is suitable for:
●
Solid wall construction
●
Gypsum wall construction
●
Solid ceiling construction
On the inside and outside is installation frame equipped by intumescent sealing. It enlarges its capacity
and air proofs the gap between damper body and installation frame and between installation frame and
wall construction.
●
Gypsum wall construction has to be installed according manufacture requirements.
●
Installation frame:
cement lime plates
●
Fasteners:
galvanized plate
●
a x b = (A + 105
+3
mm) x (B + 105
+3
mm)
POSITION:
1
Fire damper FDMA PM with Installation frame E1
2
Holder with screws
3
Gypsum plate
4
Mineral stone wool min. density 140 kg/m
5
Fire protection mastic min. thickness 1 mm