background image

A  MAJOR CAUSE OF VENT 

RELATED FIRES IS FAILURE 

TO MAINTAIN REQUIRED 

CLEARANCES (AIR 

SPACES) TO COMBUSTIBLE 

MATERIALS. IT IS OF THE 

UTMOST IMPORTANCE THAT 

DURABLACK BE INSTALLED 

ONLY IN ACCORDANCE WITH 

THESE INSTRUCTIONS.

NOTE:

Read through all of these instructions 

before beginning your installation. Failure 

to install as described in this instruction 

will void the manufacturer’s warranty, and 

may have an effect on your homeowner’s 

insurance. Keep these instructions for 

future reference.

NOT A UL LISTED PRODUCT

Dear Customer, Installer, or End User:

We welcome any comments, ideas, input or 

complaints regarding DuraVent products.  

If you are searching for tech support or product 

information, please phone us at 800-835-4429.

Or email us at:

[email protected]

IMPORTANT

DuraBlack must be installed with at least an 

18” Clearance to Combustibles.

Read all instructions carefully before starting 

the installation. The DuraVent warranty will be 

voided, and serious fire, health, or other safety 

hazards may result from any of the following 

actions: 

•  Installation of any damaged DuraBlack 

component. 

•  Unauthorized modification of any 

DuraBlack component 

•  Installation of any component part not 

manufactured or approved by DuraVent. 

•  Installation other than as instructed 

by DuraVent and the appliance 

manufacturer. Consult your local building 

codes before beginning the installation. 

INSTALLATION PROCEDURE 

Prior to beginning your installation, please 

verify what style connector pipe you have. You 

may have "Locking Tab" style, or "Trim Ring" 

style per 

Fig.1

.  These are the methods for 

attaching your connector pipe to the support 

box 

(Fig.2).

 

Step 1.

 Insert the adapter or Connector 

section of pipe into the previously installed 

Ceiling Support Box. Position it so the seams 

are facing the wall, and the smooth side is 

facing the room. For "Locking Tab" connectors, 

push the pipe in firmly, until the locking notches 

engage the top of the rim of the hole in the 

support box. For "Trim Collar" style connector, 

insert the pipe into the support box.  Slide the 

trim collar on and slide up to the support box, 

until it is next to the pipe bead.  Using the four 

pre-punched holes in the trim collar as a guide, 

drill 1/8" diameter holes in the support box, and 

affix using the sheet metal screws provided. 

It 

is extremely important that the Support Box 

be positioned so that the single wall pipe is 

at least 18” from the combustible wall, and 

also that the support box protrudes at least 

2” below the ceiling. 

Reposition the Support Box if necessary, to 

meet these two requirements.

Step 2.

 If you have "Locking Tab" style 

connectors and you are installing the optional 

Trim Collar, slide the Trim Collar upwards over 

Reviews: