![M&C CSS Series Instruction Manual Download Page 26](http://html.mh-extra.com/html/mandc/css-series/css-series_instruction-manual_682423026.webp)
26
CSS-VC-1.6 | 1.01.03
www.mc-techgroup.com
The following steps are to be carried out before initial commissioning:
•
Plug the cold-device connector of the supplied mains connection cable into the cold-device socket
for gas conditioning;
•
Connect power cord to the network;
•
Switch on power supply.
After the end of the lead time, the gas conditioning unit is ready for operation (green LED on the
controller lights up).
Notice
In the case of long-term measurements with high dust content in the
sample gas, a suitable gas sampling probe to protect the sample line
from clogging must be provided.
13.1 COOLER CONTROLLER
Display
LED red
LED yellow
LED green
Status message
After
commissioning
> 8 °C
[> 46.4 °F]
(room
temperature)
ON (status
alarm)
Lights up in the
case of an existing
flow alarm
OFF
Hightemp.: 1
Pump-warn.: 1.2 (when
pump is connected
and configured
accordingly, see
Section 16.2)
After about. 10
min.
≤
5.5 °C
[
≤
41.9 °F]
OFF
OFF
ON (cooling) OK
Normal operation
5 °C [41 °F] OFF
OFF
ON (cooling) OK
Notice
If a cooler temperature alarm is present, after default setting, the gas
sample pumps are switched off (if available) to prevent the transport of
wet sample gas into the analyzer.