background image

MPG306 BOW & STERN LINE KIT

MALONE

R

Thread free end

of cord through

hook.

Create a “left

over right”

knot & tighten.

Create a “right

over left”

knot & tighten.

Pull to test for

knot strength.

A

B

C

D

Attach hook to rope (steps A-D)

Keeping the rope tight and

S-hook in place, thread the

free end up and through a

strong point on the kayak

F

Make a loop in the rope

12” to 14” away

from the kayak or canoe.

G

Attach and dress rope to vehicle and boat (steps E-O)

Attach S-hook to vehicle

tow ring or other sturdy

body part.

E

Bend the loop over leaving

a large opening as shown.

H

Opening

Pass the loop through the

opening.

I

Pull to create a tight knot.

J

K

Thread the free end of

the rope

through the loop.

L

Pull the free end up until

the rope

is sufficiently tight.

M

Hold the rope secure with

one hand.

Form a knot with the free

end and tighten. Form

a second knot for 

safety purposes.

N

The line should be tight

and secure. Repeat for

second tie-down.

O

MALONE AUTO RACKS, 81 County Road, Westbrook, Maine 04092

Phone:  207-774-9100   Fax:  207-615-0551

Website:  www.maloneautoracks.com   Email:  [email protected]

MPG306 BOW & STERN LINE KIT

NOTE: NOT REQUIRED ON TRAILER PACKAGES

MALONE AUTO RACKS 81 County Rd. Ste 1, Westbrook, ME 04092

P: 207.774.9100   F: 207.615.0551 

E: [email protected]   W: www.maloneautoracks.com

Summary of Contents for Stax Pro2

Page 1: ...cedures you should have the product installed by a professional installer MISE EN GARDE IMPORTANTE Tout transport d un chargement sur le toit d un v hicule est potentiellement dangereux Une personne q...

Page 2: ...In order to be eligible for the Malone Warranty program we ask that you contact us online at the link provided below With in 30 days of purchase You can also mail this letter back to the address at th...

Page 3: ...See image 2 Step 1 Assembling the Insert the bottom of the top of the base Position on the post are in contac cogs on the base See im With the holes in the base push the bolt through the until the end...

Page 4: ...ee image 6 7 6 Raise the carrier into the upright position Place the carrier onto the front cross bar with the oval side of the carrier facing the front of the vehicle Swing the Jawz under the cross b...

Page 5: ...nd back until there is an even loop Repeat for the second carrier See image 11 11 9 Installation Loading Instructions MPG115MD Stax Pro2 TM Raise the carriers to the up position and confirm alignment...

Page 6: ...straps loops up and into position under the Head of the carrier See image 13A The first boat is now rotated upwards into position Again this process naturally pulls the second set of loops up and unde...

Page 7: ...e strongly recommend the use of the Malone MPG316 Sentry Ratchet Tie Down System or Malone MPG309 SpeedLine Mini Ratchet Tie Down Always check mounting hardware load straps and safety tie down lines f...

Page 8: ...as shown H Opening Pass the loop through the opening I Pull to create a tight knot J K Thread the free end of the rope through the loop L Pull the free end up until the rope is sufficiently tight M Ho...

Page 9: ...ntact the Malone dealer from whom it was purchased who will give the original retail purchaser instructions on how to proceed If the original retail purchaser is unable to contact the Malone dealer or...

Page 10: ...AYAK VERTICAL FOLD DOWN CARRIER S P O X TA R 2 TM TM Crans 1 2 3 60mm Load Straps 4 StaxPro2 Carriers T boutons 50mm 60mm Jawz Brackets MALONER Installation Loading Instructions Please Read Before Beg...

Page 11: ...fixation dans un des trous de l adaptateur Jawz et visser un bouton de serrage en T sans le serrer Voir image 6 7 6 Mettre le support en position verticale Poser le support sur la barre transversale...

Page 12: ...ration pour le deuxi me support Voir image 11 11 9 Instructions de montage et de chargement MPG115MD Stax Pro2 TM Mettre les supports en position verticale et v rifier s ils sont bien align s Serrer...

Page 13: ...ement rotatif sert tirer les sangles vers le haut en position sous la t te du support Voir image 13A Faire pivoter le premier kayak jusqu en position Ce proc d permet encore une fois de tirer le deuxi...

Page 14: ...s instructions fournies pour le MPG370 Voir image 18 Note Il faut retirer les blocs de mousse et replier les supports en position abaiss e lorsque vous ne transportez pas de kayak Instructions de mont...

Page 15: ...u v hicule E Replier la boucle en faisant une large ouverture tel qu indiqu H Ouverture Introduire la boucle dans l ouverture I Serrer pour faire un n ud solide J K Faire passer l extr mit libre de la...

Page 16: ...a d marche suivre Si l acheteur original ne r ussit pas contacter le d taillant Malone ou encore si le d taillant est incapable de rem dier la d fectuosit l acheteur original doit communiquer directem...

Reviews: