8 ENGLISH
4.
Place the hose clamps onto the grooves as illus-
trated and tighten the screws.
1
2
2
►
1.
Screw
2.
Hose clamp
5.
According to the working height, connect the rest
of extension pipes to the extension pipe which has
already been attached.
CAUTION:
Do not attach the extension pipe
if the total length including the blower body
exceeds 4 m.
6.
Turn the outlet of the end nozzle as shown in the
figure.
7.
Connect the end nozzle to the extension pipe.
When connecting, align the triangle marking on the end
nozzle and the extension pipe, and then push the end
nozzle until it clicks. After that, rotate the end nozzle to
a suitable position for your work.
1
2
3
►
1.
End nozzle
2.
Extension pipe
3.
Triangle marking
When removing the end nozzle, align the triangle mark-
ings on the end nozzle and extension pipe, and then
pull out the end nozzle from the extension pipe.
1
2
3
►
1.
End nozzle
2.
Extension pipe
3.
Triangle marking