P
8
/ 2
4
[3] DISASSEMBLY/ASSEMBLY
[3] -2. Tool Holder Section
R
epair
DISASSEMBLY
Pin 6 joining Tool holder
to Cylinder 25: 4 pcs.
Flat washer 34: 2 pcs.
1. Remove Flat washer 34
and Urethane ring 34.
2. Apply magnetized
Screwdriver to Pin 6,
Screwdriver
magnetized
with 1R288
Urethane ring 34
Pin 6: 4 pcs.
Cylinder 25
Pin 6
Tool holder
Tool holder
Cylinder 25
3. Align Tool holder's hole
with that of Cylinder 25
by pushing Tool holder.
4. Remove Pin 6 with
magnetized Screwdriver
when the both holes are
aligned each other.
Remove Tool holder and Striker
from Cylinder 25. And then, pull
out Impact bolt from Tool holder.
Tool holder section
Impact bolt
HR3200C, HR3210C
Fig. 14
Fig. 14A
3) HR3200C, HR3210C: Separate Tool holder section from Cylinder section, and remove Impact bolt from Tool holder.
(
Fig. 14
) Now Rings on Impact bolt are ready to be replaced in the next step.
3A) HR3210FCT: Separate Tool holder guide section from Cylinder section, and remove Impact bolt from Tool holder
guide. (
Fig. 14A
) Now Rings on Impact bolt are ready to be replaced in the next step.
4) If Dust is recognized inside Tool holder (Tool holder guide) after removing Impact bolt, make the inside clean.
Cylinder section
Striker
Pin 6 joining Tool holder
to Cylinder 25: 4 pcs.
Flat washer 34: 2 pcs.
Urethane ring 34
Pin 6: 4 pcs.
Tool holder guide
Cylinder 25
1. Remove Flat washer 34
and Urethane ring 34.
2. Apply magnetized
Screwdriver to Pin 6,
3. Align the Hole of Tool
holder guide with that of
Cylinder 25 by pushing
Tool holder guide.
4. Remove Pin 6 with
magnetized Screwdriver
when the both holes are
aligned each other.
Screwdriver
magnetized
with 1R288
Cylinder 25
Pin 6
Tool holder guide
Remove Tool holder guide and Striker
from Cylinder 25. And then, pull out
Impact bolt from Tool holder guide.
Tool holder
guide section
Impact bolt
HR3210FCT
Cylinder section
Striker