1R165
Large spiral bevel gear
P
7
/
9
R
epair
[3] DISASSEMBLY/ASSEMBLY
[3]-2. Large spiral bevel gear, Ball bearing 6203DDW, Ball bearing 6000LLB (cont.)
DISASSEMBLING
ASSEMBLING
Assemble new Ball
bearing 6203DDW.
Assemble Bearing
retainer.
Assemble Spindle ass’y.
Receive not only the brim portion
but also the cylindrical portion of
Bearing box with Turn table of Arbor
press when assembling Spindle ass’y.
(2) Ball bearing 6203DDW can be disassembled as illustrated in Fig. 13A, or Fig. 13B.
(1) Assemble Ball bearing 6203DDW and Spindle as illustrated in Fig. 14.
(2) Assemble large spiral bevel gear to Spindle as illustrated in Fig.15.
Bearing
retainer 50
M5x16 Pan head
screw (3pcs.)
Fig. 13A
Fig. 13B
Fig. 14
If it is difficult to remove as illustrated
in Fig. 13A, remove Ball bearing
6203DDW with the appropriate
diameter round bar and Arbor press.
Remove Ball bearing 6203DDW by striking Bearing box
against Work table.
Ball bearing
6203DDW
Bearing box
Round bar
Ball bearing 6203DDW
Brim
Cylindrical portion of
Bearing box
Spindle
ass’y
Putting Large spiral bevel gear on 1R165, press Spindle into
Arbor hole of Large spiral bevel gear with Arbor press.
Fig.15
(3) Assemble Ring spring 11 and Ball bearing 6000LLB. (Fig. 10)