P 9/10
W
iring diagram
[2] Handle
Route Field lead wires as described below in Fig. D-4.
Fig. D-4
Terminal block
(h)
(g)
(a, b, c, d)
[1] Before routing Lead wires, adhere Sponge sheet
to the back of Terminal block as illustrated to right.
[2] Route the following Lead wires under Terminal block:
(a), (d), (g), (h), (k)
[3] Fix the following Lead wires with this Lead wire holder:
(a), (b), (c), (d)
[4] Fix the following Lead wires with this Lead wire holder:
(g), (h)
[5] Route the following Lead wires between the inside wall
of Handle and the rib for fixing Controller:
(e), (f); (g), (h)
[6] Put Noise suppressor in this portion if used.
[7] Put Insulated connector in this portion.
Handle
GA5020C/ GA6020C
(k)
(e, f)
Lead wires of Controller:
(a) White, to Insulated connector
(b) Black, to Terminal block
(c) Red, to Terminal block
(d) Orange, to No.1 Terminal of Switch
(e) Black, to Pickup coil
(f) White, to Pickup coil
Field lead wires:
(g) White, to Insulated connector
(h) Orange, to No.1 Terminal of Switch
Lead wires of Noise suppressor (if used):
(i) White, to Controller
(j) Black, to Controller
Relay wire:
(k) Black, from No.3 Terminal of Switch to Terminal block
Index of Lead wire
Insulated connector
[3]
[2]
Switch
Contr
oller
(i, j)
Noise suppressor
(if used)
[4]
[5]
[5]
[6]
[7]
rib for fixing
Controller
[1]
Terminal block
Sponge sheet