Fig. 4-1-1-4
[9] Loosen four 4x18 Tapping screws, and remove Switch
box cover complete and Switch box.
Fig. 4-1-1-5
[10] Remove Tension spring 9, and loosen M4x20 Pan head
screw, and then remove Lever.
[11] Remove Switch lever and Upper pipe complete.
Fig. 4-1-1-3
[7] Loosen 4x18 Tapping screw, and remove Switch lever case cover and Switch lever case.
[8] Loosen M4x20 Pan head screw, and remove Arm.
Switch cover
Switch lever
case
Switch lever
case cover
4x18
Tapping screw
Arm
M4x20 Pan
head screw
Switch lever
Switch box
Switch box
cover complete
4x18 Tapping
screw (4 pcs.)
Tension spring 9
Switch lever
Lever
M4x20 Pan
head screw
5 / 21