P 6/ 11
R
epair
[3] DISASSEMBLY/ASSEMBLY
[3] -2. Motor Complete, Gear Assembly (cont.)
ASSEMBLING
(1) Assemble Ball bearing 6803LLU to Gear housing. Refer to the drawing on the left in
Fig. 7
.
(2) Mount Ball bearing 6806LLU to Spur gear 10. Refer to the drawing on the bottom in
Fig. 6
.
(3) Assemble the Spur gear 10 section to Gear housing. Refer to the drawing on the upper right in
Fig. 6
.
(4) Mount Oil seal 30 to Spacer. Refer to the drawing on the bottom in
Fig. 5
.
(5) Assemble Plate 23, Spacer, Internal gear 48 and Spur gear 9C complete to Gear housing as drawn in
Fig. 8
.
Fig. 9
Fig. 8
Plate 23
Oil seal 30
Internal gear 48
Gear housing
Spur gear 9C
complete
Spacer
Note:
Assemble Spacer with the convex side
of it facing to Internal gear 48.
(6) Assemble the parts on the Flat washer 5 side to Gear housing as drawn in
Fig. 9
.
1R027
Carrier A complete
Pins of Carrier
A complete
Spur gear 19B
( 3 pcs.)
Flat washer 5
Carrier B
Pin 3 (9 pcs.)
Gear housing
< Note for Assembling of Pin 3 >
Do not lubricate on Pin 3.
And, be careful that Pin 3 easily falls off.
Stop ring E-4
Spur gear 9C complete
1. Set Carrier A complete on 1R027, and
assemble Carrier B and 9 pcs. of Pin 3.
3. Assemble Spur gear 19B to the Pins of Carrier A complete.
And then, mount Flat washer 5 to Gear housing.
4. Assemble Stop ring E-4 to the shaft
on Spur gear 9C complete.
2. While holding Internal gear 48
with your fingers, assemble Gear housing
to Carrier A complete section.