11
7.2. AC Voltage Measurement
1.lnsert the black test lead into the negative
COM
terminal and the red
test lead into the positive
V CAP·TEMP·Hz%
Ω
terminal.
2. Set the function switch to the
V~
position.
3. Press the MODE/VFD key for 1 second to turn on the VFD test.
4. Press the PEAK key to tum on Peak test.
5. Connect the test leads in parallel to the circuit under test.
6. Read the voltage measurement on the LCD display.
7.3. DC Voltage Measurement
1. lnsert the black test lead into the negative
COM
terminal and the red
test lead into the positive
V CAP·TEMP·Hz%
Ω
terminal.
2. Set the function switch to the
V~
position.
3. Connect the test leads in parallel to the circuit under test.
4. Read the voltage measurement on the LCD display.
7.4. Capacitance Measurements
WARNING:
To avoid electric shock, discharge the capacitor under
test before measuring.
1. Set the function switch to the
CAP
position.
2. lnsert the black test lead banana plug into the negative
COM
jack and
the red test lead banana plug into the
V CAP TEMP Hz%
Ω
positive jack.
3. Touch the test probe tips across the part under test. If "
OL
" appears
in the display, remove and discharge the component.
4. Read the capacitance value in the display.
5. The display will indicate the proper decimal point and value.
Note:
For very large values of capacitance measurement it can take
several minutes before the final reading stabilizes.
7.5. Frequency Measurements
1. lnsert the black test lead banana plug into the negative
COM
jack and
the red test lead banana plug into the
V CAP TEMP Hz%
Ω
positive jack.
2. Set the function switch to the
V
~
HZ/%
Position.
3. Press
MODE
button to select the Frequency (Hz) or Duty cycle (%).
4. Touch the test probe tips across the part under test.
5. Read the value on the display.
6. The display will indicate the proper decimal point and value.
Summary of Contents for MT723
Page 1: ...AC DC TRMS CLAMP METER INSTRUCTION MANUAL MT723 II...
Page 2: ...2...