Major Science MS-NOR-30 Instruction Manual Download Page 13

12 

 

 
Step3. 

And fasten the flathead screws to fix the second platform. 

 

 

 
 

Note (1): 

  After finish the installation of double platforms, remember to put the rubber 
  pads back to the platforms. But note that users might have to cut off small 
  pieces of the rubber pad at 4 corners to avoid blocking the pillars.   
 

Step3 

DOMINIQUE DUTSCHER SAS

Summary of Contents for MS-NOR-30

Page 1: ...MS Orbital Shaker Instruction Manual Catalog No MS NOR 30 MS NOR 3001 www majorsci com service majorsci com Version 03B Revised on 2014 12 02 D O M I N I Q U E D U T S C H E R S A S...

Page 2: ...x MS Orbital Shaker Instruction Manual Signed by Date Major Science is liable for all missing or damaged parts accessories within 7 days after customer received this instrument package Please contact...

Page 3: ...ction 2 Product Specifications 9 Section 3 Installation Instructions 10 Installation Instruction of Double Platforms Optional 10 Instruction of Drilling Holes on the Rubber Mat 14 Section 4 Operation...

Page 4: ...ts carefully before this equipment is operated 1 Read and follow carefully the manual instructions 2 Do not alter the equipment Failure to follow these directions could result in personal and or labor...

Page 5: ...ed service representative or service majorsci com Environmental Conditions Ensure the instrument is installed and operated strictly in the following conditions 1 Indoor use only 2 95 RH 3 75 kPa 106 k...

Page 6: ...t least 10 cm of space behind the instrument and at least 5 cm of space on each side 4 Use high level of precaution against the damages on the unit 5 Do not operate the unit out of environmental condi...

Page 7: ...re explained below Indicates an area where a potential shock hazard may exist Consult the manual to avoid possible personal injury or instrument damage Indicates a warning MOVING PARTS HANDS OFF Indic...

Page 8: ...2 Product Description The orbital shaker is a microprocessor controlled orbital shaking instrument for many general purpose shaking applications in chemical and life sciences laboratories Its unique...

Page 9: ...on or clockwise anti clockwise direction Continuous or timed operation with automatic witch off Variable shaking speed up to 200rpm Interchangeable stacking platforms and accessories for a variety of...

Page 10: ...arm continuous 1 min increment Motor Stepping motor Operating Temperature Ambient to 40 C Carry Capability 10 kg Platform Dimension W x L 30 x 30cm Platform Material Painted iron metal Additional Plat...

Page 11: ...instruction to help users install the second platform If users have no requirement on double platforms please skip this section and directly go to Section 5 for Operation Instructions Tool Required a...

Page 12: ...Release the springs and remove the black rubber pad that are on the platform Step3 Insert 4 pillars to the holes at 4 corners And fasten the pillars tightly Step2 Step3 D O M I N I Q U E D U T S C H E...

Page 13: ...e 1 After finish the installation of double platforms remember to put the rubber pads back to the platforms But note that users might have to cut off small pieces of the rubber pad at 4 corners to avo...

Page 14: ...double platform with double layer pillars just insert another pillar on the first layer pillar and fasten it tightly then screw the flathead screw to fix the second platform on the pillars D O M I N...

Page 15: ...without any drilled holes If you would like to fasten the flask holders on the platform along with the rubber mat here we offer the instruction of drilling procedure Step1 Release the strip springs a...

Page 16: ...m and place a thick cushion the size should be similar as the size of platform on the rubber mat and platform Step4 Turn over the platform and use a white marker to mark the screw holes that fasten th...

Page 17: ...ols when drilling the mat Step6 The finished rubber mat should be as the picture below Note The rubber mat in the illustration below has been drilled for the different sizes of flask holders from 125...

Page 18: ...on it Note Use the correct sized screws to install the flask holders on the platform along with the rubber mat We ll provide a set of holder screws attached to your purchase of MS Orbital Shaker with...

Page 19: ...18 If the rubber mat is not required when you install the holders please use M4 8 mm screws to fasten them in case of damages on other parts D O M I N I Q U E D U T S C H E R S A S...

Page 20: ...se either rpm or time value to decrease shaking cycles rotation for forward and backward 3 Key activate or stop the unit 4 Key To set either rpm or timer setting mode 5 TIMER This LED light indicates...

Page 21: ...g AC outlet of the appropriate voltage selectable 115V or 220V as indicated on the rating sticker near the AC cord on the back of the unit 3 Turn the AC power ON 4 Press Key to select either rpm or ti...

Page 22: ...ital shaker was switched off during the shaking state due to a power outage upon resume of power the system will start buzzing and countdown from 10 to 0 After which it will resume back to the shaking...

Page 23: ...use For additional fuses contact Major Science co ltd To replace the fuse 1 Turn off the main power switch on the rear of MS Orbital Shaker and detach the power cord from the rear of MS Orbital Shaker...

Page 24: ...be cleaned with a moist cloth containing a mild soap solution The belts might need to be replaced after running out its life time and please contact Major Science or its distributor for this part D O...

Page 25: ...holders 110 220V MS NOR 30 FH1000 MS NOR 30 with 4x 1000ml flask holders 110 220V MS NOR 3001 FH125 MS Orbital anti moistured shaker with 12x 125ml flask holders 110 220V MS NOR 3001 FH250 MS Orbital...

Page 26: ...under the warranty is limited to the receipt of reasonable proof by the customer that the defect is embraced within the terms of the warranty All claims made under this warranty must be presented to M...

Reviews: