
10
Major Science Orbital Shaker is actually a pre-installed instrument. As long
as it is placed on a sturdy and level surface in a safe, dry place, and
sufficient spare space in the neighborhood for shaking movement, it is ready
for operation.
Installation Instruction of Double Platforms (Optional)
If users purchase the additional platforms, here we offer a simple
installation instruction to help users install the second platform.
If users have no requirement on double platforms, please skip this
section and directly go to
Section 5 for Operation Instructions
.
Tool Required: a crosshead screw driver (Not provided)
Step1. Get ready the second platform, aluminum pillars and 4 flathead
screws, which are included in the purchased package.
Note:
If users require double platforms with “single-layer pillars”, then 4 pillars are
needed. And if double platforms with “double-layer pillars” are required, 8
pillars are needed.
DOMINIQUE DUTSCHER SAS