STEP 6.
STEP 7.
Remarks:Except for pre-installing the hardware you need
Remarks:Except for pre-installing the hardware you need
BOLT(M10*90)
1.
4pcs
4pcs
WASHER(M10)
6.
8pcs
LOCKNUT(M10)
5.
SHOCK PAD
7.
4pcs
6
6 5
6 5
6 5
6 5
1
6 1
6 1
6
1
PRE-
INSTALLED
F
G
G
7
7
H
H
F
Note: Please do not fully tighten the screws at the tube
connectionuntil the smith bar is installed
Note: Please do not fully tighten the screws at the tube
connectionuntil the smith bar is installed