
41D2001
10
BV4536, BV5142 Natural Vent Gas Fireplace
INSTALLATION INFORMATION
FINISHING MATERIAL
Measure fireplace dimensions and ve-
rigy framing methods and wall covering
details before framing constructions be-
gins.
Only noncombustible materials (i.e. brick, tile, slate, steel or other materials with a UL fire rating of Zero)
may be used to cover the black surface of the appliance. A 300° F minimum adhesive may be used to
attach facing materials to the black surface. If joints between the finished wall and the fireplace sur-
round are sealed, a 300° F minimum sealant material (General Electric RTV 103 or equivalent) must
be used.
NOTE
The fireplace must be installed giving
full consideration to the clearances and
height requirements identified in this
manual.
NOTE
Any remote wiring (i.e. remote control and wall
switch) must be done prior to final finishing to
avoid costly reconstruction.
&0
FINISHINGMATL
Combustible
Finishing Material
High Temperature
Sealant is Permitted
at These Joints
Noncombustible Materi-
als Only are Permitted to
Cover Black Face of Unit
FP2192
Figure 6 -
Finishing Material
POSITIONING THE FIREPLACE
1. Bend out the four (4) nailing flanges located on the sides of the fireplace. For 5/8” drywall, use the
two (2) outer most flanges. For 1/2” drywall, use the two (2) inner flanges.
2. Slide the firebox into prepared framing or position fireplace in its final position and frame later. Be
sure fireplace is resting on a flat surface.
3. Set unit level and plumb by checking the top and front of unit. Shim side-to-side and front-to-back
as necessary.
4. Anchor nailing flanges of the fireplace to the side-framing members using 8d nails or other suitable
fasteners.