Majestic • QUARTZ32, QUARTZ36 Installation Manual • 2412-980 Rev. H • 10/16
20
Two Elbows
Top Vent - Horizontal Termination - (continued)
Figure 4.11
Note
: Use SLP Series
components only.
Note
: There MUST be a 25%
reduction in total H when
using
fl
ex vent except when
using the simple up and out
installation. See Figure 4.8.
Fire Risk.
• When using SLP-HRC-SS termination cap
on top vented
fi
replaces, a one foot minimum
vertical vent section is required before installing
fi
rst elbow.
• When using DVP-TB1 termination cap on top vented
fi
replaces, a three foot minimum vertical vent section is
required before installing
fi
rst elbow.
INSTALLED
HORIZONTALLY
H
1
H
2
V
1
WARNING *
V Minimum
H
1
+ H
2
Maxi-
mum
ALL MODELS
90 Elbow *
1/2 ft. 152 mm
1/2 ft.*
152 mm
1 ft.
305 mm
1-1/2 ft.*
457 mm
2 ft.
610 mm
2-1/2 ft.*
762 mm
4 ft.
1.2 m
3-1/2 ft.
1.1 m
6 ft.
1.8 m
4-1/2 ft.
1.4 m
14 ft.
4.3 m
H + H
1
MAX. =14 ft. (4.3 m)
V + H + H
1
MAX. = 40 ft. (12.2 m)
* See warning below