background image

14

LDVR Series Direct Vent Gas Fireplace

10007317

DVR584-600

Rear vent no elbows

2/99   djt

20" 

(508mm)

Top View

Straight Venting

FP836

Rear Vent-Top View

11/21/98

20"

(508mm)

Max.

REAR VENT-TOP VIEW

20"

(508mm)

Max.

Top View

Rear Vent Corner Installation

Fig. 14

  Rear vent applications, one 45° elbow.

45°

45°

Rear Wall Installation

Twist Lock Pipe

STEP 1

Locate vent opening on the wall. To locate hole center 
consult with appropriate fireplace dimensions, Page 4. 
Frame as shown below.

NOTE:

 When using flex vent, the opening will have to 

be measured according to the 1/2” (13 mm) rise in 12” 
(305 mm) vertical run.

Combustible Walls 

(Fig. 15)

Cut a 10

³⁄₈

”H x 9

³⁄₈

” W 

(264 x 240 mm) hole through the exterior wall and 
frame as shown. 

Noncombustible Walls

 (Fig. 15)

:

 Hole opening must 

be 7

¹⁄₂

” (190mm) in diameter. 

STEP 2

Measure wall thickness and cut zero clearance sleeve 
parts to proper length (MAXIMUM 12”/305 mm). As-
semble sleeve and attach to firestop with #8 sheet 
metal screws (supplied). (Fig. 16)

VO584-100

Vent Opening

2/99   djt

Vent Opening for Combustible Wall

9

³⁄₈

(240mm)

10

³⁄₈

(264mm)

Fireplace Hearth

Framing 

Detail

Opening for Noncombustible Wall

7

¹⁄₂

(190mm)

VO584-100

Fig. 15

  Locate vent opening on wall.

ZCS101 

Zero Clearance Sleeve

3/11/99   djt

Max. Length 

12” (305mm)

#8 Screws (2)

#8 Screws 

(2)

Adjustable 
Zero Clearance 
Sleeve

#8 

Screws 

(2)

Adjustable Zero Clearance Sleeve

ZCS101

Fig. 16

  Adjustable zero clearance sleeve.

Firestop

STEP 3

Measure from the fireplace collar or elbow face to face 
of outside wall (add 2” for vent pipe overlap). Mark 
pipes and cut to length. It is very important that the two 
pipes are flush with the outside wall once the fireplace 
is in its final location. (Fig. 17)

STEP 4

Slip 4” and 7” pipes onto respective flue collars. Make 
sure to fix to the fireplace collar the 4” pipe with three 
(3) screws before fixing the 7” pipe on the 7” collar. 
Both pipes must be on a level plane. (Fig 18)

STEP 5

Guide the vent termination 4” collar into the 4” pipe then 
the 7” collar into the 7” pipe. Do not force the venting 
into position. If the pipes do not line up with the termi-
nation collars, disassemble pipes and reattach to the 
fireplace collar. (Fig. 18)

STEP 6

Secure fireplace to floor through floor holes and adjust-
able frame drywall strip (nailing flange) to frame. (Refer 
to Framing & Finishing Section).

Summary of Contents for LDVR1

Page 1: ...r from your neighbor s phone Follow the gas suppliers instructions If you cannot reach your gas supplier call the re department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FIRE...

Page 2: ...nate Switch Location 8 EB 1 Electrical Box 9 Electronic Gas Control Valve 9 General Venting Information General Venting 10 General Venting Information Termination Location 11 General Information Assem...

Page 3: ...equate ventilation and combustion air to operate properly 13 This replace must not be connected to a chimney ue serving a separate solid fuel burning replace 14 When the replace is not in use it is re...

Page 4: ...nt terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBS...

Page 5: ...mm E 24 632 mm 24 610 mm 27 686 mm 31 788 mm F 11 292 mm 16 406 mm 16 406 mm 16 406 mm G 14 362 mm 18 476 mm 18 476 mm 18 476 mm H 19 501 mm 24 616 mm 24 616 mm 27 686 mm I 23 590 mm 27 705 mm 27 705...

Page 6: ...efer to Figs 3a and 3b and the following Mantel Charts The tting of a bay window trim kit does not effect the distances and reference points referred to in the diagram and chart Noncombustible mantels...

Page 7: ...while ange B is for 5 8 drywall 3 Bend the desired anges out 90 on both sides of the replace Slide the replace into the framed opening until the anges contact the front surfaces of the framing Level t...

Page 8: ...7 The gas control is equipped with a captured screw type pressure test point therefore it is not necessary to pro vide a 1 8 test point up stream of the control When using copper or ex connector use...

Page 9: ...line to the brass screw polarized of the socket assembly 6 Connect the white wire of the power line to the chrome screw of the socket assembly 7 Connect the ground wire of the supply line to the green...

Page 10: ...front of the termination hood Do not locate termination hood where excessive snow or ice build up may occur Be sure to check vent termi nation area after snow falls and clear to prevent ac cidental b...

Page 11: ...et 3 91cm 3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9...

Page 12: ...Temperature Sealant Hose Clamp FP1471 Fig 11 Apply high temperature sealant to 4 and 7 pipes Outside Corner Inside Corner Termination Clearances Termination clearances for buildings with combustible...

Page 13: ...ar wall is 20 508mm Fig 14 Only one 45 elbow is allowed in these installations Minimum clearances between vent pipe and com bustible materials are as follows Top 2 51 mm Sides 1 25 mm Bottom 1 25 mm H...

Page 14: ...Wall 9 240mm 10 264mm Fireplace Hearth Framing Detail Opening for Noncombustible Wall 7 190mm VO584 100 Fig 15 Locate vent opening on wall ZCS101 Zero Clearance Sleeve 3 11 99 djt Max Length 12 305mm...

Page 15: ...g outcrop the vent pipe must ush up with the siding It is always best to locate the replace in such a way that minimizes the number of offsets and horizontal vent length The horizontal vent run refers...

Page 16: ...n Figure 23 Dimension A plus B must not be greater than 17 5 2 m The maximum number of 45 elbows permitted per side wall installation is two 2 These elbows can be installed in either the vertical or h...

Page 17: ...equired for combustible walls STEP 3 Attach the appropriate venting component s to the inner and outer ue collars of the replace using three 3 screws Fig 27 Follow with the installation of the inner a...

Page 18: ...ons When it is not possible to meet the required vent ter minal clearances of 12 305 mm above grade level a snorkel vent kit 7TDVSNORK is required It allows installation depth of down to 7 178 mm belo...

Page 19: ...approved for 1 Vertical installations up to 40 12 m in height Up to 10 3 m horizontal vent run can be installed within the vent system using a maximum of three 90 elbows Vertical Through the Roof Appl...

Page 20: ...rovide a minimum of 1 inch clearance to the vent pipe i e the hole must be at least 9 x 9 240 x 240mm 5 Place replace into position 6 Place restop s 7DVFS or Attic Insulation Shield 7DVAIS into positi...

Page 21: ...Up Installation 1 26 00 djt 40 12 m Storm Collar Roof Flash ing Vent Termination Roof 2 Min Roof Support Attic Insulation Shield Attic Insulation Joists Joists FP1022 Fig 37 Typical straight up insta...

Page 22: ...rmination Kit Starter Kit Model 7TDVSKV Vertical Venting for 7TDVSKV A order 1 12 to 6 12 roof pitch for 7TDVSKV B order 7 12 to 12 12 roof pitch for 7TDVSKV F order at roof Starter Kit for Below Grad...

Page 23: ...glass cleaner within the rst few weeks of operation After the initial cleaning process the glass should be cleaned two or three times during each operating season depending on the environment in the h...

Page 24: ...ont Center B161 B138 B138 Rear B158 BC14 BD15 Rear Left A41 Rear Right A42 Top Center A44 BD18 33LDVR 1 Place rear log left A41 on rear bracket ensure the notch on the left end locates against the ben...

Page 25: ...rock material around the rebox base Rear B158 Front Left B160 Front Center B161 Front Right B159 LG481 Fig 42 Correct log placement for 36LDVR 39LDVR 1 Place rear log BC14 on rear bracket ensure log i...

Page 26: ...nd the rebox base Rear BD15 Top Center BBD18 Front Right BD17 Front Left BD16 Lava Rock Front Center B138 Ember Material Lava Rock LG434 Fig 44 Correct log placement for 43LDVR Do not place any of the...

Page 27: ...nt Gas Fireplace 10007317 Glowing Embers LG482 LG384 33LDV log flames 1 05 Glowing Embers LG384 Glowing Embers LG415 Glowing Embers LG435 Fig 48 Correct burner ame appearance for the LDVR replaces 33L...

Page 28: ...follow these instruc tions exactly B BEFORE LIGHTING smell all around the heater area for gas Be sure to smell next to the oor because some gas is heavier than air and will settle on the oor WHAT TO D...

Page 29: ...to repair it call a quali ed service technician Force or attempting repair may result in a re or explosion D Do not use this appliance if any part has been under water Immediately call a quali ed ser...

Page 30: ...All Wiring Connections Replace Piezo Ignitor Supply Line Hooked Up Shutoff Valve Open Pilot Stays Lit For Air In The Lines Thermopile Needs A Min 325mv Adjust Pilot Flame Height All Wiring Connection...

Page 31: ...e Continuously Monitored Heating Cycle Complete LED OFF NO YES NO NO YES Abnormal Operation 5 sec Inter Trial Delay LED Steady Flash Lockout Flame detected out of sequence Reset by interrupting ON OFF...

Page 32: ...ts are used Fig 50 Nova SIT820 Gas Valve D E F FC108 SIT regulator conversion 10 03 OF F P I L O T O FC107 SIT820 valve conversion 10 03 A B C OF F P I L O T O FC107 108 Natural Gas Log Locator Pin Pr...

Page 33: ...them if necessary Check the manifold and supply pressures against the appli ance speci cations Most of these components may require only an occasional checkup and cleaning and some may require adjust...

Page 34: ...ithout notice 33 36 39 43LDVR HI LO 22 21 19a b 18a b 41 17 30 33LDVR 1 1a 1b 1c 1d 1e 1f 1a 36LDVR 1 1g 1h 1i 2 3 6a b 8 7a b 9 11 12 13 14 15 16 20 23 24 25 26 29 31 32 33 34 35 37 39 7317 LDVR part...

Page 35: ...lot Hood 10002385 10002385 10002385 10002385 10 Manifold Tubing w Fittings 57318 57318 57318 57318 11 Thermocouple RN RP 53373 53373 53373 53373 12 Thermopile RN RP 51827 51827 51827 51827 13 Electrod...

Page 36: ...Control from Synetek EN 10007939 10007939 10007939 10007939 40 Wire Harness EN Synetek low voltage 10008139 10008139 10008139 10008139 41 Wire Harness EN Synetek high voltage 10008140 10008140 1000814...

Page 37: ...eniently located wall socket Method B Using EB 1 Receptacle Box The EB 1 receptacle box Pt ZA1200 may be hard wired into the house supply The fan lead is then plugged into the EB 1 box For instruction...

Page 38: ...ring Take care when handling the refractory panels as they are fragile until held in place and supported Installation Refer to Figures 54 55 1 Remove the front window frame assembly 2 Remove the logs...

Page 39: ...33LDVR 33DVMTKB Black Adjustable Medium Trim Kit Appliance Model Trim Kit 36LDVR ADVMTKP Polished Brass 36LDVR ADVMTKS Pewter 36LDVR ADVMTKB Black 39LDVR ADVMTKP Polished Brass 39LDVR ADVMTKS Pewter 3...

Page 40: ...40 LDVR Series Direct Vent Gas Fireplace 10007317...

Page 41: ...41 LDVR Series Direct Vent Gas Fireplace 10007317...

Page 42: ...42 LDVR Series Direct Vent Gas Fireplace 10007317...

Page 43: ...must pay for any Authorized Dealer in home travel fees or service charges for in home repair work It is the dealers option whether the repair work will be done in the customer s home or in the dealer...

Page 44: ...2 83 59 36LDVRRN 57 5 81 82 58 36LDVRRP 57 5 82 83 58 36LDVREN 63 6 81 82 58 36LDVREP 63 6 82 83 58 39LDVRRN 50 2 76 79 63 39LDVRRP 50 2 79 80 63 39LDVREN 54 2 78 79 63 39LDVREP 54 2 79 80 63 43LDVRRN...

Reviews: