14 Appendix
14.1 Benchmark commissioning checklist
CONDENSING BOILERS ONLY
The condensate drain has been installed in accordance with the manufacturer’s instructions and/or
s
e
Y
8
9
7
6
S
B
/
6
4
5
5
S
B
COMBINATION BOILERS ONLY
Is the installation in a hard water area (above 200ppm)?
Yes
No
Yes
No
DOMESTIC HOT WATER MODE
Measure and Record:
Gas rate
m³/hr
OR
ft³/hr
Burner operating pressure (at maximum
r
a
b
m
)
e
t
a
r
OR
Gas inlet pressure at maximum
r
a
b
m
e
t
a
r
Cold water inlet temperature
°C
Hot water has been checked at all outlets
Yes
Temperature
°C
I/min
CENTRAL HEATING MODE
measure and record:
Gas rate
m³/hr
OR
ft³/hr
Burner operating pressure (if applicabl
r
a
b
m
)
e
OR
Gas inlet
r
a
b
m
e
r
u
s
s
e
r
p
°C
Central heating return temperature
°C
ALL SYSTEMS
’s
s
e
Y
s
n
o
i
t
c
u
r
t
s
n
i
What system cleaner was used?
What inhibitor was used?
Quantity
litres
Yes
No
CONTROLS
(tick the appropriate boxes)
Time and temperature control to heating
Room thermostat and
b
a
m
m
a
r
g
o
r
P
r
e
m
i
t
/
r
e
m
m
a
r
g
o
r
p
le room thermostat
Load/weather
m
u
m
i
t
p
O
n
o
i
t
a
s
n
e
p
m
o
c
start control
Time and temperature control to hot water
Cylinder thermostat and
n
o
i
t
a
n
i
b
m
o
C
r
e
m
i
t
/
r
e
m
m
a
r
g
o
r
p
Boiler
Heating zone valves
t
o
N
d
e
t
t
i
F
required
Hot water zone valves
t
o
N
d
e
t
t
i
F
required
Thermostatic radiator val
t
o
N
d
e
t
t
i
F
s
e
v
required
Automatic bypass to
t
o
N
d
e
t
t
i
F
m
e
t
s
y
s
required
Boiler interlock
Provided
Customer
e
T
:
e
m
a
n
lephone number:
Address:
Boiler make and model:
Boiler serial number:
Commissioned by (PRINT
s
a
G
:
)
E
M
A
N
Safe register number:
Company
e
T
:
e
m
a
n
lephone number:
Company address:
Commissioning date:
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the
warranty. This does not affect the customer’s statutory rights.
%RWKIOXHWHVWSRLQWSOXJVDUHLQSODFH
7KHIURQWFRYHULVFRUUHFWO\ILWWHG WKHVHFXULQJVFUHZVDUHIXOO\WLJKWHQHG
Warning
After servicing or performing any maintenance on the boiler
ensure that
14 Appendix
64