Maico 0093.1563 Mounting Instructions Download Page 8

 
 
 

VENTILATOREN

1.2.1 Electrical installation 

Establish electrical connection in ER UP/G, 
ER-UPD, and ER-UPB housing according 
to connection variant. 

 

Connection variants, base load/full load 
for ER-A, ER-AK, ER-AH and ER-AB 

 

 

Connection variants for interval, 
humidity, movement for ER-AK, ER-AH, 
ER-AB 

 

1.3 Inserting fan filter and mounting 
the cover 

 

 

1.  Insert the fan insert in the housing. 
2.  Ensure that all locking hooks and the 

flat safety catch are engaged. 

3.  Put on the cover and fasten with a 

central screw. 

Summary of Contents for 0093.1563

Page 1: ...lld mmung beachten GEFAHR Gefahr bei Betrieb mit nicht komplett montiertem Ventilator An elektrischen Komponenten besteht Stromschlaggefahr Bei offenem Ger t m ssen alle Versorgungsstromkreise angesch...

Page 2: ...Geh useabdeckung montiert sein GEFAHR Gefahr durch Stromschlag Vor dem Abnehmen der Geh useabdeckung und vor Elektroinstallationen alle Versorgungsstromkreise abschalten Netzsicherung ausschalten und...

Page 3: ...ecker auf die Stiftleiste aufstecken 2 Adapterplatine ber den F hrungsdorn in den freien Elektronikbauraum legen 3 Adapterplatine mit Befestigungsschraube befestigen Impressum Maico Elektroapparate Fa...

Page 4: ...ndlast Volllast f r ER A ER AK ER AH ER AB Anschlussvarianten Intervall Feuchte Bewegung f r ER AK ER AH ER AB 1 3 Ventilatoreinsatz einsetzen und Abdeckung montieren 1 Den Ventilatoreinsatz in das Ge...

Page 5: ...g with the fan not fully mounted Electric components are a potential source of electric shock If the unit is open all off the supply circuits must be switched off mains fuse off secured against being...

Page 6: ...d the housing cover installed DANGER Danger of electric shock Before removing the housing cover and before installing the electrics switch off all supply circuits as well as the mains fuse and secure...

Page 7: ...ug connector with flat plug 2 Place the adapter board in the free electronic installation space using the locating pin 3 Fasten adapter board with retaining bolts Acknowledgements Maico Elektroapparat...

Page 8: ...nection variants base load full load for ER A ER AK ER AH and ER AB Connection variants for interval humidity movement for ER AK ER AH ER AB 1 3 Inserting fan filter and mounting the cover 1 Insert th...

Page 9: ...ent mont Danger d lectrocution pr sent par les composants lectriques Lorsque l appareil est ouvert tous les circuits d alimentation lectrique doivent tre coup s fusible secteur d sactiv et prot g s co...

Page 10: ...he du bo tier mont DANGER Risque d lectrocution Avant de retirer le cache du bo tier et avant l installation lectrique couper tous les circuits d alimentation lectrique d sactiver le fusible secteur e...

Page 11: ...t sur la barrette enfichable 2 Poser la platine d adaptation dans l espace de montage lectronique libre via la broche de guidage 3 Fixer la platine d adaptation avec la vis de fixation Mentions l gale...

Page 12: ...de raccordement dans le bo tier ER UP G UPD UPB Variantes de raccordement charge de base charge pleine pour ER A ER AK ER AH ER AB Variantes de raccordement intervalle humidit mouvement pour ER AK ER...

Reviews: