![Mahindra ML170 series Operator'S Manual & Installation Instructions Download Page 71](http://html.mh-extra.com/html/mahindra/ml170-series/ml170-series_operators-manual-and-installation-instructions_3695746071.webp)
70
22.1. SKID STEER BALE PROBE
IMPORTANT: This spear is a high strength alloy – drop forged steel and should not be welded or heat-
treated.
IMPORTANT: Maximum load limit on super penetrator bale spear is 2,000 pounds.
22.2. ASSEMBLY INSTRUCTIONS
22.2.1. Install Bale Spear into tapered sleeve and
secure with nut. Torque nut 515 ft. lb. Failure to
follow these instructions could cause damage to
spear and void your warranty.
(1) Upper Spear.
Flat surface of spear located upward.
(2) Tapered Sleeve.
(3) Upper Spear Nut, 28mm.
Torque nut to 515 ft. lb.
(3)
(2)
(1)
22.3. INSTALLATION INSTRUCTIONS TO SKID STEER TOOL CARRIER
IMPORTANT: Refer to Pages 64 to 66 for instructions concerning Installing Attachment to Skid Steer Tool
Carrier.
IMPORTANT: Refer to Page 67 for instructions concerning Removing Attachment from Skid Steer Tool
Carrier.
22.4. OPERATING INSTRUCTIONS
22.4.1. With bale spear level with ground, slowly
spear bale slightly above center.
22.4.2. With all three spears completely engaged into
bale, tilt bale spear slightly back from level and
transport the load in a low position.
Spear bale
slightly
above
center of
bale.
Summary of Contents for ML170 series
Page 11: ...10 SAFETY DECALS...
Page 79: ...78 25 TORQUE CHART...