BA551501-en
13
3
Transport and Storage
NOTICE
Check package to ensure it is complete, in accordance with the order
confirmation. Report any transport damage to the carrier immediately.
During loading, unloading and transport always use suitable lifting equipment,
material handling equipment (e.g. cranes, forklifts, etc.) and the right load
handling attachments and slings. Always ensure that the parts to be
transported are suspended or loaded properly so that they cannot fall, taking
into account size, weight and the centre of gravity.
Store the packages in a covered area, protected from direct sunlight, at a low
humidity and with temperatures between 0...+40 °C
(32…104
°F). Do not stack
packages.
When unpacking, take care to avoid any possibility of injury or damage. Keep at
a safe distance when opening the package strapping, do not allow any parts to
fall out.
4
Installation and Initial Operation
WARNING
Installation and commissioning of the equipment must be carried out by
specially trained personnel, authorised for the task. Specialist personnel
includes authorised, trained skilled staff from the manufacturer, the dealer and
the relevant service partners.