150331_IOM_GS_PE-LMD_BASIKA_rho_gb
11 von 30
When the electric connection has been finished please check the phase sequence (turning
to the right) of the power line prior to commissioning. If the phase sequence of the power
line is not correct two phases of the power line need to be swapped.
Only a competent electrician may swap the two phases of the power line under stress-free
conditions.
7.
Commissioning
Prior to commissioning the grease separator is to be filled with water.
•
Main switch at the control panel is turned to “ OFF“ and secured against restart by
means of a padlock.
•
Check whether the cover of the grease separator fits and is closed perfectly by means
of the snap buckles (clamping rings).
•
Check whole plant for tightness (especially the flanges when the plant was
disassembled at site). Condition: Grease separator is filled with fresh water until it
drains.
•
Check whether the electric connection was made according to the valid prescriptions.
•
If necessary have the power supply be added-on from the sub distribution to the
control panel of the plant.
•
Open the control panel of the grease separator and check the phase sequence (must
be turning to the right) at the feeder.
•
Are all power supply leads of the devices connected correctly?
•
Turn main switch at the control panel to position “ON“.