6
III. SET UP INSTRUCTIONS
The following procedure verifies proper operation of the machine.
1.
Place the electronics cabinet and Magnetizing Fixture in their final operating location.
2.
Connect water source to the Magnetizing Fixture, if required.
3.
Connect the Magnetizing Fixture to the electronics cabinet.
4.
Set Voltage Control at minimum voltage (full counter-clockwise), and function select
switch to Manual (center) position.
5.
Connect AC power cord to a grounded power outlet capable of supplying 15 amps of
continuous power.
6.
Turn on electronics cabinet power switch.
7.
The fan, the red Power On light, and the white Ready-to-Charge light should come on.
8.
Press the Charge push-button. The machine will charge to approximately 100 volts and
the green Ready-to-Magnetize light should come on.
9.
Press the Magnetize push-button. The Magnetizer will discharge through the Fixture and
remain idle for approximately 2 to 90 seconds.
10.
After this period of off-time the white Ready-to-Charge light will come back on, allowing
the cycle to be reinitiated.
11.
Press the Charge push-button and slowly increase the Voltage Control until desired
working voltage is reached.
The machine is now ready to begin processing parts.
Summary of Contents for 942B
Page 2: ......
Page 25: ...18 NOTES...