46
mSwing
Installation and assembly
Procedure
Prerequisites:
›
The foundation was built.
›
The empty conduits for the mains cable and the control lines were laid.
›
The foundation has cured.
›
The swing door is prepared for mounting.
IMPORTANT!
Follow the separate notices and instructions for the composite
mortar and foundation anchors.
1. Determine the orientation of the blocking element.
NOTICE
Wrong orientation of the blocking element! Note figure.
ä
2. Sketch the boreholes using the floor plate.
Mag0101
7
Fig. 19: Sketching the boreholes
3. Bore holes for the sleeves with inner thread.
ä
4. Clean the boreholes with compressed air.