
18 MAGICFX® STAGE SHOT II, STADIUM SHOT II & X-TREME SHOT
—
User and Installation Manual
2
Switch the power on and check if
1. the LED power indicator lights up;
2. you hear a click sound.
3
If desired run a test with pressure. Follow the step from Section 3.5 and 3.6.
3.4
FILL WITH CONFETTI AND/OR STREAMERS
1
Make sure that the machine is functioning correctly by running a test first, see Section 3.3..
2
Make sure that the pressure level is zero by checking the tank pressure meter. If necessary
depressurize the system by opening the ventilation valve.
3
Place a lifting core in the bottom of the
output pipe.
Make sure the lifting core lies flat and
closes off the hole in the output pipe!
4
Fill the output pipe with confetti and/or streamers.
Check Chapter 1 for the maximum amount per approved type of input.
Summary of Contents for STAGE SHOT II
Page 25: ......
Page 26: ...WWW MAGICFX EU...