
Mini-Crawler Crane
M A E D A
Table of Contents
1/2019 MC285C-3
vii
Cable Connection Port ....................................................................................... 4-85
No. 1 Outrigger/Slewing Operation Lever No. 2 Outrigger/Telescoping Operation
Lever No. 3 Outrigger/Winch Operation Lever No. 4 Outrigger/Lifting and
Lowering Operation Lever ................................................................................. 4-85
Operation Mode Selector Switch ....................................................................... 4-86
LED Light (Front) LED Light (Control Panel) ..................................................... 4-86
Left Display Right Display .................................................................................. 4-86
Transmitter Display Components ........................................................................... 4-87
Standby Screen ................................................................................................. 4-88
Crane/Outrigger Screen ..................................................................................... 4-88
Menu Screen ..................................................................................................... 4-88
Status Indications of Display .................................................................................. 4-90
Battery Icon ....................................................................................................... 4-90
Battery Status Icon ............................................................................................ 4-90
Radio Wave Status Bar ..................................................................................... 4-90
Error Icon ........................................................................................................... 4-90
Receiver Components ............................................................................................ 4-91
Control Box ........................................................................................................ 4-91
Monitor LED ....................................................................................................... 4-92
Connector connection port ................................................................................. 4-92
Antenna ............................................................................................................. 4-92
REMOTE CONTROL SYSTEM VERIFICATIONS ........................................................... 4-93
Before Turning On Transmitter ............................................................................... 4-93
After Turning On Transmitter .................................................................................. 4-93
After Starting Engine .............................................................................................. 4-93
Checking Engine Start Operation ...................................................................... 4-94
Checking Engine Stop Operation ...................................................................... 4-94
Checking Outrigger Operation ........................................................................... 4-94
Checking Crane Operation ................................................................................ 4-95
REMOTE CONTROL SYSTEM OPERATION.................................................................. 4-96
Powering ON .......................................................................................................... 4-97
Starting/Stopping the Engine .................................................................................. 4-97
Starting the Engine ............................................................................................ 4-97
Stopping the Engine .......................................................................................... 4-97
Operation after Engine Is Started ........................................................................... 4-97
Operation before Work ...................................................................................... 4-97
Switching Operation Mode ................................................................................. 4-98
Outrigger Operation ................................................................................................ 4-98
Outrigger Setting ............................................................................................... 4-99
Outrigger Stowage ........................................................................................... 4-100
Crane Operation ................................................................................................... 4-101
Hook Raising/Lowering Operation ................................................................... 4-101
Boom Lifting/Lowering Operation .................................................................... 4-102
Boom Telescoping Operation .......................................................................... 4-102
Slewing Operation ........................................................................................... 4-103
Micro Speed Mode Switch Operation .............................................................. 4-103
Emergency Engine Stop Switch (EMO) Operation .......................................... 4-103
Horn Switch Operation ......................................................................................... 4-104
Summary of Contents for MC285C-3
Page 1: ...Operation Manual Mini Crawler Crane 102ME OM1901 00...
Page 17: ...1 2019 MC285C 3 1 1 Section 1 INTRODUCTION...
Page 19: ...1 2019 MC285C 3 2 1 Section 2 SAFETY...
Page 28: ...Section 2 SAFETY LABEL LOCATIONS Mini Crawler Crane M A E D A 2 10 1 2019 MC285C 3 Fig 2 2...
Page 47: ...1 2019 MC285C 3 3 1 Section 3 SPECIFICATIONS TERMINOLOGY AND CAPACITY CHARTS...
Page 75: ...1 2019 MC285C 3 4 1 Section 4 OPERATION...
Page 217: ...1 2019 MC285C 3 5 1 Section 5 MAINTENANCE AND INSPECTION...
Page 252: ...Section 5 PERIODIC MAINTENANCE Mini Crawler Crane M A E D A 5 36 1 2019 MC285C 3 Fig 5 55...
Page 314: ......