
ITEM
Page
8.5.4 ELECTRONIC CONTROL SYSTEM
3 – 214
8.5.5 MOMENT LIMITER
3 – 215
8.5.6 OVER HOIST DETECTOR
3 – 216
INSPECTION AND MAINTENANCE
4 –
1
1. PRECAUTIONS REGARDING MAINTENANCE
4 –
2
2. BASIC MAINTENANCE
4 –
4
3. LEGAL INSPECTION
4 –
7
4. SAFETY CRITICAL PARTS
4 –
8
5. CONSUMABLES
4 –
9
6. OTHER COMPONENTS
4 – 10
7. USE OF FUEL, COOLANT AND LUBRICANT
4 – 11
7.1 USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT
TEMPERATURES
4 – 11
8. TIGHTENING TORQUE SPECIFICATIONS
4 – 13
8.1 STANDARD TIGHTENING TORQUE LIST
4 – 13
9. INSPECTION AND MAINTENANCE LIST
4 – 14
10. MAINTENANCE PROCEDURES
4 – 17
10.1 INITIAL 500-HOUR MAINTENANCE
(ONLY FOR FIRST TIME MAINTENANCE OF A NEW MACHINE)
4 – 17
10.2 CHECKING BEFORE OPERATION
4 – 17
10.3 IRREGULAR MAINTENANCE
4 – 18
10.4 MAINTENANCE EVERY 50 HOURS
4 – 42
10.5 MAINTENANCE EVERY 100 HOURS
4 – 44
10.6 MAINTENANCE EVERY 250 HOURS
4 – 46
10.7 MAINTENANCE EVERY 500 HOURS
4 – 51
10.8 MAINTENANCE EVERY 1000 HOURS
4 – 60
10.9 MAINTENANCE EVERY 2000 HOURS
4 – 71
10.10 MAINTENANCE EVERY 4000 HOURS
4 – 72
10.11 MAINTENANCE EVERY 5000 HOURS
4 – 73
11. BLEEDING AIR FROM HYDRAULIC SYSTEM
4 – 76
12. METHOD FOR RELEASING PRESSURE IN HYDRAULIC CIRCUIT
4 – 80
SPECIFICATIONS
5 –
1
1. SPECIFICATION LIST
5 –
2
2. SPECIFICATION DIMENSIONAL DRAWING
5 –
4
3. RATED TOTAL LOAD CHART
5 –
5
4 WORKING RADIUS AND LIFTING HEIGHT
5 –
8
FLY-JIB
6 –
1
1.PRECAUTIONS OF FLY-JIB OPERATION
6 –
2
2.SAFETY LABEL LOCATION
6 –
4
2.1 SAFETY LABEL LOCATION AT FLY-JIB
6 –
4
3. WORKING RANGE CHART
6 –
5
4. TOTAL RATED LOAD CHART
6 –
6
5. FLY-JIB EACH SECTION
6 –
7
Summary of Contents for LC785M-8B
Page 2: ......
Page 21: ...Gauges and meters To be shown at service meter section on machine monitor 1 13 ...
Page 22: ...1 14 ...
Page 56: ... SAFETY LABEL LOCATIONS ON CHASSIS 2 34 ...
Page 64: ... 29 Safety plate 09659 A057B 2 42 30 Warning for hook block 553 4267400 2 places ...
Page 310: ...8 Press the button of dust indicator to return the red piston to its original position 4 30 ...
Page 323: ...4 43 ...
Page 364: ...2 SPECIFICATION DIMENSIONAL DRAWING 5 4 ...
Page 369: ...WORKING RADIUS AND LIFTING HEIGHT AT WIRE ROPE 2 FALLS 5 9 ...
Page 370: ...WORKING RADIUS AND LIFTING HEIGHT AT WIRE ROPE 1 FALLS 5 10 ...
Page 375: ...3 WORKING RANGE CHART 6 5 ...
Page 398: ......
Page 400: ......
Page 401: ......