
ITEM
Page
3.21.3 OPERATIONS DURING PICK & CARRY OPERATION
3 – 176
3.21.4 RELEASING PICK & CARRY OPERATION POSTURE
3 – 176
3.22 OPERATION OF BLADE
3 – 177
3.22.1 PRECAUTION OF BLADE OPERATION
3 – 177
3.22.2 OPERATION OF BLADE
3 – 178
3.22.3 WORKING WITH A BLADE GROUND LEVELLING
3 – 178
3.23 PARKING MACHINE
3 – 179
3.24 MACHINE INSPECTION AFTER DAILY WORK
3 – 180
3.24.1 BEFORE STOPPING ENGINE
3 – 180
3.24.2 AFTER STOPPING ENGINE
3 – 180
3.24.3 LOCKING
3 – 180
3.25 CAUTIONS IN TRAVELLING
3 – 181
4. HANDLING WIRE CABLES
3 – 184
4.1 BENCHMARK FOR REPLACING WIRE CABLES
3 – 184
4.2 WINCH WIRE ROPE FALL MODE AND RATED TOTAL LOAD
3 – 186
4.3 WHAT TO DO WITH TWISTED WINCH WIRE ROPE
3 – 187
5. TRANSPORTATION
3 – 190
5.1 LOADING / UNLOADING
3 – 191
5.1.1 LOADING
3 – 192
5.1.2 SECURING MACHINE
3 – 194
5.1.3 UNLOADING
3 – 195
5.2 LIFTING MACHINE
3 – 196
5.2.1 LIFTING THE MACHINE IN THE BOOM LOWERED POSTURE
3 – 196
5.2.2 LIFTING UP THE MACHINE IN THE BOOM RAISED POSTURE
3 – 198
5.3 TRANSPORTATION PROCEDURE
3 – 199
6. HANDLING IN COLD WEATHER
3 – 200
6.1 PREPARING FOR LOW TEMPERATURE
3 – 200
7. LONG TERM STORAGE
3 – 202
7.1 BEFORE STORAGE MACHINE
3 – 202
7.2 DURING STORAGE
3 – 202
7.3 AFTER STORAGE
3 – 202
8. TROUBLES AND ACTIONS
3 – 203
8.1 RUNNING OUT FUEL
3 – 203
8.2 PHENOMENA THAT ARE NOT FAILURES
3 – 203
8.3 METHOD FOR TOWING
3 – 204
8.4 DISCHARGED BATTERY
3 – 205
8.4.1 CAUTIONS IN BATTERY HANDLING
3 – 205
8.4.2 BATTERY REMOVAL AND INSTALLATION
3 – 206
8.4.3 CAUTIONS IN BATTERY CHARGING
3 – 207
8.4.4 STARTING ENGINE WITH BOOSTER CABLE
3 – 208
8.5 OTHER TROUBLE
3 – 210
8.5.1 ELECTRICAL SYSTEM
3 – 210
8.5.2 CHASSIS
3 – 211
8.5.3 ENGINE
3 – 212
Summary of Contents for LC785M-8B
Page 2: ......
Page 21: ...Gauges and meters To be shown at service meter section on machine monitor 1 13 ...
Page 22: ...1 14 ...
Page 56: ... SAFETY LABEL LOCATIONS ON CHASSIS 2 34 ...
Page 64: ... 29 Safety plate 09659 A057B 2 42 30 Warning for hook block 553 4267400 2 places ...
Page 310: ...8 Press the button of dust indicator to return the red piston to its original position 4 30 ...
Page 323: ...4 43 ...
Page 364: ...2 SPECIFICATION DIMENSIONAL DRAWING 5 4 ...
Page 369: ...WORKING RADIUS AND LIFTING HEIGHT AT WIRE ROPE 2 FALLS 5 9 ...
Page 370: ...WORKING RADIUS AND LIFTING HEIGHT AT WIRE ROPE 1 FALLS 5 10 ...
Page 375: ...3 WORKING RANGE CHART 6 5 ...
Page 398: ......
Page 400: ......
Page 401: ......