10
Assemble arcs 4в in pairs using ridge cover
plate and strainer 9. Connect end elements 5
to arcs 4в using arm.
Connect balks
2
to
assembled arcs.
2
2
4в
Assembling stages
Fig. 5
Fig.6
Level the frame using fi lling or deepening of pits to make longitudinal elements straight,
horizontal and parallel to each other and to make arcs even at side view. If arc planes
require leveling, loosen connections of balks with arcs, complete leveling on the ground and
tight screws again. Fill frame supports with soil after fastening bottom wire bandages on
element 3 (
Fig. 10
).
Perform the installation close to location of the greenhouse.
Install greenhouse in accordance with photographs of installation stages and units
represented in
Fig. 5…12
. The fi gures show installation of greenhouse of 4 m length.
Required length is reached using attachment of appropriate number of Vstavka insert
packages. Use M5x10 screws for connection of elements.
Dig pits on the site selected for greenhouse installation at a depth of shovel blade
according to
Fig. 4
. Install frame into the pits. Check equality of frame diagonals using a
cord. Total draft of greenhouse into the ground should be so that bottom elements 6 of
door opening touch the ground. Check equality of the diagonals using a cord again and
correct position of the frame angles.
1.
2.
3.
4.
Installation sequence
4в
5
5
5
2
2
2
2
2
2
2
2
2
2
2
2
arm
Manual
ridge cover
plate
4в
4в
4в
4в
4в
4в
4в
4в
4в
4в
4в
Б
4в
9
9
9
9
А
Б
В
А
Б
В