![Macrovision Corporation SAMREPORT-LITE 2006 Manual Download Page 26](http://html1.mh-extra.com/html/macrovision-corporation/samreport-lite-2006/samreport-lite-2006_manual_3269583026.webp)
time, an error is introduced into the UTC timestamps recorded in the report
log.
■
The time zone on the machine where SAMreport-Lite is running is set
incorrectly. Even if the clock time looks correct, the time zone may not be
set correctly.
Setting Start and End Dates for a Report
Start and end dates for report output can be set in text fields in the middle
portion of the SAMreport-Lite main window. Times can be included. If no
start and end dates are set, the report is generated with data from the entire
report log. If no time is specified, days begin at midnight, 00:00:00.
The following formats are accepted for 3:30 pm on January 31, 2006:
1/31/2006 15:30:00
MM/dd/yyyy HH:mm:ss
1/31/2006 15:30
MM/dd/yyyy HH:mm
1/31/2006
MM/dd/yyyy
20060131 153000
yyyyMMdd HHmmss
20060131 1530
yyyyMMdd HHmm
20060131
yyyyMMdd
Jan 31, 2006 15:30:00
MMM dd, yyyy HH:mm:ss
Jan 31, 2006 15:30
MMM dd, yyyy HH:mm
Jan 31, 2006
MMM dd, yyyy
HH is measured by a 24-hour click (0-23). MMM can be either the three-letter
abbreviation for the name of a month or the full name of the month (Jan,
January, jan, january, JAN, JANUARY).
22 | Chapter 5 Report Input and Output