8
2.
When the devices are used outdoor , they should be install in safe island ,build
tent to protect turnstile from raining, installation in the open air is strictly prohibi-
ted.
Debugging instruction
1.
Preparation before debugging
turnstile , turnstile wiring diagram
2.
System function introduction
•
Turnstile operation: left side will open when received valid
Signal, direction indicator turn green, LED display turnstile rotate numbers ; pe-
ople push turnstile gate after swipe authorized card, photoelectric switch works
and c1 . The equipment support several times turnstile operation but only
permit one person to pass at a time. If the pedestrian has not pass in the limited
time, the system will reset automatically
•
Arm drop function : The pole drop down automatically after cut off power
Pole can be lifted by people after connect with power
3. Checking the electromagnet
The no-load current of the electromagnet should be less than 800mA before
installation. The electromagnet start torque should meet the usage requirement.
Thereafter, installation could begin.
4. Checking the system
Check the equipment before power on to make sure the mechanical parts opera-
te well
5. Checking the wire connection
Check wire connection according to the wire diagram, and the equipment should
earthing normally
6. The first debugging
Press SET Key on the main board enter menu setup, choose P09 to adjust rotation
direction of the electromagnet, then press INC Key, he rotation direction should
be left; or you should exchange the wiring connection of he electromagnet; When
backward from menu, equipment will self-exam its rotation direction. If the me-
Summary of Contents for AC-ATRI-018
Page 2: ...2...
Page 14: ...14 Wiring Diagram Remark below 1 and 2 need do cable connection...
Page 15: ...15 ENG...
Page 16: ...16...
Page 30: ...30...