30 |
P a g e
7.
Once the machine head is on the scaffold, the stand can be positioned and fixed
either to the scaffold boards or roof. (Fig. 5.) Alternatively the head can be clamped to
the handrail using the clamp provided. (Fig. 6.) Ensure returning belt carriers clear
scaffold before starting machine.
8.
With the machine secured on to the scaffold. The delivery chute is now fitted by
slotting in to the head lugs. Then rotate and extend as required. (Fig. 7.)
Summary of Contents for Bumpa 110v 6m
Page 12: ...12 P a g e 1 Reverse 5 Forward 2 Stop 6 Stop 3 Forward 7 Reverse 4 Emergency stop CONTROLS...
Page 34: ...34 P a g e Decal Diagram...
Page 36: ...36 P a g e 6m Bumpa 8m Bumpa 10m Bumpa DIMENSIONS...
Page 37: ...37 P a g e 6m Bumpa OPERATING ANGLES...
Page 38: ...38 P a g e 8m Bumpa...
Page 39: ...39 P a g e 10m Bumpa...