Table 1: PDI Checklist 

Checkoff 

Item 

Reference 

 

Lifting bar and other packaging removed 

Section 3a 

 

Header latches properly seated  

Section 6a and b 

 

Operating position set to 23 degrees 

Section 8 

 

Hydraulic and electrical properly connected to 

combine and functioning  

Section 6d and Section 12 

 

Drive shaft properly connected to combine 

Section 6c 

 

Deck plates correctly set 

Section 12h 

 

Gathering chains properly set and tensioned 

Section 12k 

 

Auger drive chains properly tensioned 

Section 12g 

 

Snouts  and  dividers  properly  adjusted  and 

secured 

Section 9 and 10 

 

All  safety  shields  functioning,  secured,  and 

installed 

 

Gearbox lubricant checked for proper fill 

Section 12a and d 

 

Snapping roll clearances properly set 

Section 12i 

 

Hardware is tight and  

 

Free rotation of chopper knives (if applicable) 

and drives 

Section 12a and c 

 

Header run-up for 30 min 

Section 12b 

 

Summary of Contents for C Series

Page 1: ...Unloading and Assembly Instructions Shipments 215037 Original Instruction The harvesting specialists C Series Corn Header Dealer Revision B...

Page 2: ...der and prepping for field use Table of Contents 1 Safety 2 2 Header Lifting Points 6 3 Tipping Header Down and Removing Shipping Stands 6 4 Moving Driveline Storage Bracket from Shipping to Field Pos...

Page 3: ...idelines DANGER Indicates an imminently hazardous situation that if not avoided will result in death or serious injury WARNING Indicates a potentially hazardous situation that if not avoided could res...

Page 4: ...ith slip resistant soles Protective glasses or goggles Heavy gloves Wet weather gear Respirator or filter mask Be aware that exposure to loud noises can cause hearing impairment or loss Wear suitable...

Page 5: ...hine function and or safety It may also shorten machine s life To avoid bodily injury or death from unexpected startup of machine ALWAYS stop the engine and remove the key from the ignition before lea...

Page 6: ...Dealer C Series 1 3 Safety Signs Keep safety signs clean and legible at all times Replace safety signs that are missing or illegible If original part on which a safety sign was installed is replaced b...

Page 7: ...al for header weights c When lifting a 12 row header use four cables as shown in bottom right of Figure 1 3 Tipping Header Down and Removing Shipping Stands a Use lifting bar on top of header to attac...

Page 8: ...ield Position a Driveline storage bracket s must be moved down from the shipping to field position Figure 3 5 Moving Header Clearance Lights from Shipping to Field Position a Remove U bolts securing c...

Page 9: ...and folding headers will have a driveline attach to each side of the combine feederhouse ii Ensure driveline guard retention chain is secured to the guard and driveline storage bracket and the guard...

Page 10: ...front snouts Figure 8 Brackets support snout in service position and can be found in wooden shipping crate 8 Setting Header Angle a Place combine harvester on level ground b To set header angle lower...

Page 11: ...esting on 4 x 4 blocks adjust the snout height so the tip of the snout is just touching the ground b Adjust major position by changing position of bolt as shown in Figure 10 circled i Ensure nut faces...

Page 12: ...driven components c If header is configured with chopping gearboxes ensure they turn on and off d Check level of all gearboxes with header deck angle at 23 degrees operating position i Main Gearbox O...

Page 13: ...nsure there is between 0 5 and 0 75 of total deflection at mid span red arrow Figure 14 ii See Operator s Manual for adjustment procedure h Check deck plate clearance with the deck plates set to their...

Page 14: ...phasing Figure 17 i Fully staggered Figure 17 left lease aggressive good conveyance ii One lug staggered Figure 17 right factory iii Fully in phase lugs aligned most aggressive l Check auger timing i...

Page 15: ...uger drive dog on wing to correct timing if needed See operator s manual for further detail m Check lighting and confirm proper operation n Inspect header for loose hardware missing parts etc o Place...

Page 16: ...and functioning Section 6d and Section 12 Drive shaft properly connected to combine Section 6c Deck plates correctly set Section 12h Gathering chains properly set and tensioned Section 12k Auger driv...

Page 17: ...16 891 7313 f 816 891 7323 LLC MacDon Russia Ltd 123317 Moscow Russia 10 Presnenskaya nab Block C Floor 5 Office No 534 Regus Business Centre t 7 495 775 6971 f 7 495 967 7600 MacDon Australia Pty Ltd...

Reviews: