background image

TYPICAL TOOLS REQUIRED:  measuring tape,  phillips screwdriver, 5/16”, 11/32”, 7/16”, and 1/2 

spin

-

tite, end wrenches and / or sockets. Heavy duty models may require larger sizes.

 

 

 

1.

 

Lay  out  the  boom  sections  and  assemble  using  the 

DIMENSION sheet as a guide for position and hardware. 

 

 

 

2.

 

Cut  a  strip  of  masking  tape  about  6”  long.  Fold  the 

ends under and stick the tape to a flat surface, sticky 

side  up. 

Lay out the elements by length and position as 

shown  the  DIMENSION  sheet.  NOTE:  THE  ELEMENTS 

IN  THIS  ANTENNA  DO  NOT  ALL  TAPER  IN  LENGTH.  

Now lift off the REFLECTOR and find the rough center by 

balancing it across finger. Push on a black button insulator 

to about 1/2” from center. Insert the element through the 

holes  at  the  rear  of  the  boom  and  install  the  second 

button. IF THE ELEMENT IS LOOSE IN THE BUTTONS, 

SQUEEZE  THE  SMALL  END  OF  EACH  BUTTON 

SLIGHTLY  WITH 

PLIERS 

UNTIL 

IT 

OFFERS 

SIGNIFICANT  RESISTANCE  WHEN  THE  ELEMENT  IS 

INSERTED. THIS WILL HELP TO HOLD THE ELEMENT 

IN  POSITION  DURING  SUBSEQUENT  OPERATIONS. 

Install  the  3/16”  rod  DRIVEN  ELEMENT  as  you  did  the 

reflector.  Then  continue  with  the  installation  of  the 

DIRECTORS. 

Note that the Director Elements may not 

consistently  diminish  in  length  from  rear  to  front,  so 

pay close attention to length and position.

 

 

 

3.

 

Now  begin  centering  the  elements.  Use  a  tape  measure  to  EQUALIZE  the  amount  the  element 

sticking out on each side of the boom. Once all are centered, sight down the antenna from the rear 

and  compare  tip  symmetry.  Look  for  any 

obvious discrepancies and correct if found.

 

 

4.

 

Stainless  steel  SHAFT  RETAINERS  are  used 

for  securing  the  elements  and  insulators. 

Always  use  retainers  for  permanent  and  long 

term antenna installations. For most portable or 

temporary  use,  the  button  insulators  are 

satisfactory and the retainers may be left off. 

 

 

 

5.

 

Use  thumb  and  index  finger  to  hold  a  Shaft 

Retainer  over  end  of  the  3/8”  X  3”  push  tube 

(internal  fingers  dished  into  tube).  Hold  the 

element firmly and start the keeper onto the rod 

by  applying  pressure  with  the  push  tube.  Push 

the  Shaft  Retainer  down  element  until  tight  against  the  button  insulator  (Locking  pliers, 

lightly

 

clamped up against opposite button insulator will help maintain center reference and keep you from 

pushing  the  first  Shaft  Retainer  too  far).  Repeat  for  the  opposite  side.  Continue  installing  Shaft 

Retainers until all elements are locked in place.

 

 

6.

 

Mount  the  DRIVEN  ELEMENT  FEED  BLOCKS  to  the  boom  using  a  single  8

-

32  screw  1

-

1/4"  long. 

Orient  with  feed  and  balun  connectors  as  shown  on  the  Dimension  Sheet.    The  ‘T’  block  mounts 
behind the rear driven element. 

 

 

 
 

M

A

S

K

I N

G

  T

A

P

E

O

R

  E

Q

U

I V

A

L E

N

T

F

A

C

E

  U

P

E

L E

M

E

N

T

  P

R

E

P

A

R

A

T

I O

N

R

E

F

L E

C

T

O

R

E

L E

P

R

E

P

M

.   S

T

A

A

L

5 - 2 4 - 0 5

F

R

O

N

T

  D

I R

E

C

T

O

R

418CP30 ASSEMBLY MANUAL 

Reviews: