background image

M2DU

5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
Phone: +81(6)6659-8201  Fax: +81(6)6659-8510  E-mail: [email protected]

EM-5028  Rev.6  P. 2 / 2

TERMINAL CONNECTIONS

Connect the unit as in the diagram below or refer to the connection diagram on the side of the unit.

 

EXTERNAL DIMENSIONS  unit: mm (inch)

5

9

21.5 (.85)

70.5 (2.78)

84 (3.31)

10 (.39)

15 (.59)

6 (.23)

59 (2.32)

DIN RAIL

35mm wide

[4 (.16)]

8–M3

SCREW

72 (2.83)

23 (.91)

2–4.2x5

(.17x.20)

MTG HOLE

6 (.24) deep

114 (4.49)

• When mounting, no extra space is needed between units.

4

8

12
14 13

1

4 (.16)

 

CONNECTION DIAGRAM

5

+

+

4

8

1

+

MONITOR

(10 – 50mA DC)

mA

+

OUTPUT

9

12

U(+)

V(–)

POWER

13

14

2-WIRE

TRANSMITTER

WIRING INSTRUCTIONS

 

SCREW TERMINAL

Torque: 0.8 N·m

 

SOLDERLESS TERMINAL

Refer to the drawing below for recommended ring tongue 
terminal size.  Spade tongue type is also applicable.
Applicable wire size: 0.25 to 1.65 mm

2

 (AWG 22 to 16)

Recommended manufacturer: Japan Solderless Terminal 
MFG.Co.Ltd, Nichifu Co.,ltd

6 (.24) max

3.3 (.13) max

mm (inch)

CHECKING

1) Terminal wiring:  Check that all cables are correctly con-

nected according to the connection diagram.

2) Power input voltage:  Check voltage across the terminal 

13 – 14 with a multimeter.

3) Input:  Check that the input signal is within 0 – 100% of 

the full-scale.

4) Output:  Check that the load resistance meets the de-

scribed specifications.

ADJUSTMENT PROCEDURE

This unit is calibrated at the factory to meet the ordered 
specifications, therefore you usually do not need any cali-
bration.
For matching the signal to a receiving instrument or in case 
of regular calibration, adjust the output as explained in the 
following.

 

HOW TO CALIBRATE THE OUTPUT SIGNAL

Use a signal source and measuring instruments of sufficient 
accuracy level.  Turn the power supply on and warm up for 
more than 10 minutes.

1) ZERO:  Apply 0% input and adjust output to 0%.
2) SPAN:  Apply 100% input and adjust output to 100%.
3) Check ZERO adjustment again with 0% input.
4) When ZERO value is changed, repeat the above proce-

dure 1) – 3).

MAINTENANCE

Regular calibration procedure is explained below:

 

CALIBRATION

Warm up the unit for at least 10 minutes.  Apply 0%, 25%, 
50%, 75% and 100% input signal.  Check that the output 
signal for the respective input signal remains within accu-
racy described in the data sheet.  When the output is out of 
tolerance, recalibrate the unit according to the “ADJUST-
MENT PROCEDURE” explained earlier.

LIGHTNING SURGE PROTECTION

M-System offers a series of lightning surge protector for 
protection against induced lightning surges.  Please contact 
M-System to choose appropriate models.

Reviews: