![background image](http://html1.mh-extra.com/html/m-system/md-lc2/md-lc2_installation-instructions-manual_3135977002.webp)
EM-8228 Rev.3
P. 2 / 3
MD-LC2
INSTALLATION
Detach the yellow clamps located at the top and bottom of the
unit for separating the body from the base socket.
n
DIN RAIL MOUNTING
Set the base socket so that
its DIN rail adapter is at the
bottom. Hung the upper hook
at the rear side of
base socket on the DIN rail
and push in the lower. When
removing the socket, push
down the DIN rail
adapter utilizing screwdriver
(–) and pull.
n
WALL MOUNTING
Refer to the drawing in the
next page.
TERMINAL CONNECTIONS
Connect the unit as in the diagram below.
Be sure to connect the shield wire to the Shield terminal (3 and 8) and ground the terminal 8 of the MD-LC2.
n
GROUNDING
A cross-over wire between M-RESTER and ground or metallic
housing of equipment is required for protection. When the
protected equipment has no ground terminal, ground only
the M-RESTER.
M-RESTER
2
11
4
12
M-RESTER
5
4
12
2
11
15
14
14
15
(PROTECTED EQUIPMENT)
9
1
10
8
7
3
6
7
9
Remote Sensing
Strain Gauge Transmitter LC2/LCS2
SHIELD
1
2
OUTPUT
8
7
POWER
EXC
INPUT
1
5
6
10
8
3
EXC +
EXC –
(+)
(–)
OUTPUT
Strain Gauge
(PROTECTED EQUIPMENT)
SHLD
4
5
10
11
6
9
3
S
+
S
–
–
G
SHLD
+
–
U(+)
V(–)
+
L1
L2
metal housing
Clamp
(top & bottom)
DIN Rail
35mm wide
Spring Loaded
DIN Rail Adaptor
Shape and size of the base socket
are slightly different with various
socket types.
M-RESTER
PROTECTED
EQUIPMENT
G
G
CROSSOVER WIRE
GROUNDING
(100 ohms or less)
A crossover wire between M-RESTER ground and the ground or
metallic housing of the equipment is required for protection.
If the protected equipment has no ground terminal, ground the
M-RESTER only.