I N S T R U C T I O N S
Power Panel
Installation Instructions
S P E C I F I C A T I O N S U B M I T T A L
Job Name:
Model Numbers:
Job Number:
I-115
1221 Admiral Street Richmond VA 23220 800-817-1204 LuXoutShades.com
LSPP-12V-29A-18S
5). Low Voltage Wiring
A.
SHOCK HAZARD. Risk of serious injury or death. Locate and lock the supply
breaker in the OFF position before wiring to the terminal blocks.
1. Turn off power at the circuit breaker.
2. Route the secondary wiring to the shade so the connection to the shade wiring can be
concealed in the shade headbox. Secondary wiring may be routed into the headbox either
by dropping the wire in through the top of the headbox, or drilling a hole in the shade
endcap.
3. Identify the shade wiring cable.
4. Remove 0.25 in (6.3 mm) of the insulation from both the white and white/black wires.
5. Connect the wires to the shade cable using the provided WAGO wire connectors.
Connect the white shade wire to the +12V lead of the wiring. Connect the white/black
shade wire to the common of the wiring.
6. Restore power to the Power Panel and confirm that the shade is energized. Refer to the
LuXout Shade Installation and Programming guide for programming and operating
instructions.
Connect the
secondary wiring
to the shade
wiring cable via
wire connectors
provided.
- Connection should
be concealed
within headbox