![Luxier SP20-CEC Manual Download Page 8](http://html1.mh-extra.com/html/luxier/sp20-cec/sp20-cec_manual_1952290008.webp)
Luxier
SP20-CEC
Rev. A 102019
8
Installation (cont.)
1”
5. Using a drill with a tile bit, drill the hole slowly into the tile. Do
not drill into any piping or wiring in the wall. Insert the anchors
into the wall.
(
NOTE:
Before drilling the tiles, use a small piece of painters
tape or masking tape over the drill area. This will prevent dam-
ages to the tiles)
6. Secure the mounting brackets to the wall with the screws.
7. Apply thread sealant tape to the threading on the shut-off
valves before connect both hot and cold water supply hoses
to the valves.
IMPORTANT :
- Make sure the water supply hoses are connected to the
corresponding shut-off valves - i.e. cold water hose to the cold
water valve and hot water hose to the hot water valve. The
thermostatic valve will not function properly if the hoses are
installed incorrectly.
- Before hanging the shower panel on the wall. Turn on both
shut-off valves and test all water functions on the shower
panel and check for leaks at this point. You should have good
water flow to the shower panel and full temperature control
from the knobs.
The range of the control knob is limited in both clockwise
and counter-clockwise directions. DO NOT force to
turn the knob pass its limit. Overturning the control will
damage the thermostatic valve making it fail to regulate
temperature.