background image

Luxier

SP20-CEC 

Rev. A 102019

7

Installation

1. Remove top cover. Attach the top panel to the main body 

with the supplied nuts and bolts. Run the water supply hoses 

through the hole on the top panel.

2. Trim off excess water supply hoses and attach to the spray 

head unit according to the hose labels and close the top cover.

1

2

3

4

5

3. Install hand shower cradle (1) to the shower panel by installing 

the rubber washer (2) and the locking nut (3) and attach white 

plastic hose tube connector (5) with PVC tubing to complete the 

connection. (

NOTE: 

Make sure the silicon gasket (4) is seated 

properly inside the connector.)

4. Lift the panel to determine the proper height and placement.  

It is recommened to aim the top horizontal body jet to the chest 

area for optimal showering experience. Mark the positions of 

the 2 brackets on the wall and set a side the panel.

(

NOTE:

 The distance between the two brackets should be 700 

mm or 27.56”)

700mm

27.56”

Summary of Contents for SP20-CEC

Page 1: ...an inspired design Fingerprint resistance finish Durable stainless steel frame construction Contemporary brass hand shower 4 stage shower functions Rainfall Waterfall Massage Spray Hand Shower SP20 CE...

Page 2: ...gence improper installation product abuse product misuse or use of cleaners containing abrasives alcohol or other organic solvents whether performed by a contractor service company or yourself are exc...

Page 3: ...package for shipping damage and make sure all parts are included with the shower panel Keep the product in its package until you are ready to install Read and understand this installation guide compl...

Page 4: ...al product may vary depends on model Fig A This is the distance from the bottom edge of the shower panel to the shower panel inlet valve NOTE This distance vary by models always take the actual measur...

Page 5: ...with a water saving device with restricted flow rate as required by the state of California To learn more about this water saving feature please contact our customer service department 508 mm 20 1 625...

Page 6: ...Waterfall 05 Top Cover 06 Locking Nut 07 Rubber Washer 08 Hand Shower 09 Hand Shower Cradle 10 Hand Shower Hose 11 Water Supply Hoses 12 Check Valves 13 Thermostatic Valve 14 Diverter 15 Screws x 4 1...

Page 7: ...o the shower panel by installing the rubber washer 2 and the locking nut 3 and attach white plastic hose tube connector 5 with PVC tubing to complete the connection NOTE Make sure the silicon gasket 4...

Page 8: ...Make sure the water supply hoses are connected to the corresponding shut off valves i e cold water hose to the cold water valve and hot water hose to the hot water valve The thermostatic valve will n...

Page 9: ...water supply hoses will greatly reduce the performance of the shower panel After the shower panel is set properly on the wall apply silicon sealant on both sides of the shower panel to prevent the uni...

Page 10: ...nter openings and gaps and cause damage 8 After cleaning rinse thoroughly with clean water to remove any cleaner residue Temperature Control Function Selector 1 Turn the temperature control knob to se...

Page 11: ...ater supply hoses for kinks Due to limited space behind the shower panel the hoses can get kinked very easily Make sure the hoses are free of kinks when hanging the shower panel on the wall Lastly mak...

Page 12: ...Retaining Plate 6 See Figure A for reference 6 Use a pair of pliers to pull out the Thermostatic Valve 7 for cleaning Figure B 7 Use commercially available hard water scale remover to clean the valve...

Page 13: ...king on the Temperature Scale 4 at 12 o clock position Figure H Before You Begin Read and understand this instruction completely before service the shower panel Make sure the service site is clean and...

Page 14: ...eneral installation process NOTE Luxier is not a liated with the owner of the video The purpose of this video is meant to provide a visual concept of the shower outlet box to speed up the installation...

Reviews: