Luxier
SP20-CEC
Rev. A 102019
7
Installation
1. Remove top cover. Attach the top panel to the main body
with the supplied nuts and bolts. Run the water supply hoses
through the hole on the top panel.
2. Trim off excess water supply hoses and attach to the spray
head unit according to the hose labels and close the top cover.
1
2
3
4
5
3. Install hand shower cradle (1) to the shower panel by installing
the rubber washer (2) and the locking nut (3) and attach white
plastic hose tube connector (5) with PVC tubing to complete the
connection. (
NOTE:
Make sure the silicon gasket (4) is seated
properly inside the connector.)
4. Lift the panel to determine the proper height and placement.
It is recommened to aim the top horizontal body jet to the chest
area for optimal showering experience. Mark the positions of
the 2 brackets on the wall and set a side the panel.
(
NOTE:
The distance between the two brackets should be 700
mm or 27.56”)
700mm
27.56”