GB
42
4. Maintenance and servicing
4.1 Changing the batteries
The flow meter is running on 3 alkaline manganese batteries LR 1, SIZE N. The LCD display indicates the approaching
end of the battery life with the word „BATT“
18
.
+
If the „BATT“ display flashes, the batteries must be changed within 1-2 weeks.
Once the „BATT“ display is indicated permanently, the batteries require immediate changing.
Danger!
When changing the batteries in explosion hazard areas danger of explosion occurs!
Blast wave: Flying parts can cause death.
Change of battery only outside of hazardous location with appropriate tools. Only following battery
types are approved:
• VARTA High Energy; No. 4901; Size LR
1
• VARTA Electronic Alkaline; No. 4001; LR1; LADY; N; AM5
• DURACELL ALKALINE; SIZE N; MN9100; LR1
• Energizer Alkaline; E90; LR1; N
Mounting steps:
1.
Unscrew the battery compartment lid
20
2.
Remove the batteries
3.
Insert new batteries, checking for correct polarity
19
4.
Screw the battery compartment lid
20
5.
Press key RESET
+
If the flow meter is not used for longer periods, the batteries must be removed!
C. Operating unit
Summary of Contents for 0212-100
Page 2: ...GB 2 ...
Page 62: ...62 GB ...
Page 65: ...65 GB ...
Page 67: ...67 GB ...
Page 69: ...69 GB Relaismodul see spare part list flow meter programm accessories ...
Page 71: ...71 GB Relaismodul see spare part list flow meter programm accessories ...