
Installing a LUT-ELI-3PH Unit with a
GRAFIK Eye
®
QS Unit
• Provide proper short-circuit and overcurrent protection
at the distribution panel. Maximum circuit breaker
installation of 20 A.
• When normal power loss is detected at the LUT-ELI-3PH
unit, all zones in the
GRAFIK Eye
QS units will go to their
emergency states.
• The
GRAFIK Eye
QS unit MUST be powered from a
normal/emergency power feed.
Note: For 1-phase 2-wire application, connect phase A, b, and C wires on
LUT-ELI-3PH together for phase sensing.
Wiring to a
GRAFIK Eye
QS Control Unit
´FACP´ N/O
CONTACTS
TAGE WIRING
GN
D
SENSE
NOT USED
LED1
LED3
LED2
RADIOTOUC
H
PHASE
FACF
S1
TEST
12
9
8
7
6
5
4
3
2
1
´FACP´
CP´ N/O
CCONTACTS
TAGE WIRING
S
EN
SE
N
O
T
US
E
D
LED
RADI
O
TOUC
H
12
8
7
6
5
4
3
7
9
8
7
6
5
4
3
2
1
´FACP´ N/C
CONTACTS
´FACP´ N/O
CONTACTS
CLASS 2 LOW VOLTAGE WIRING
SENSE
DRAIN
MUX
MUX
+24VFW
COMMO
N
NOT USED
LED3
RADIOTOUCH
12
11
10
9
8
7
6
5
4
3
2
1
Signal
+24 V
Rasterized
Common
(3) 18 AWG
(0.75 mm²)
GRAFIK Eye
QS unit (back view)
Normal/Emergency
20 A 120 V
1-Phase 2-Wire
power feed
(3) 12 AWG (2.5 mm²)
120-127 V
or
220-240 V
distribution panel
100-347 V
Normal supply
CCI SIG
24 V
CCI Com
S P E C I F I C AT I O N S U b M I T TA L
Page
Job Name:
Job Number:
Model Numbers:
LUTRON
®
LUT-ELI-3PH
Power Accessories
P/N 369-299B 11 11.11.10
11