background image

List of parts

Luoman 724 Tavi

Mark

thickn. width

length

pcs

pack.no.

Gable triangle log, drilled

F5

70

135

1537

2

Gable triangle log

F6

70

135

1411

2

Gable triangle log

F7

70

135

1157

2

Gable triangle log

F8

70

135

903

2

Gable triangle log

F9

70

135

649

2

Floor beam

L5

40

145

3285

8

Floor beam

L6

40

145

2145

9

Roof purlin

KA2

40

145

6250

5

Floor beam for loft

L7

40

120

2270

5

Floor beam for loft

L8

40

120

1400

5

Supportin post for ridge purlin, side boards

KA3

40

120

1200

2

Supportin post for ridge purlin, middle boards

KA4

40

120

200

2

Supportin post for purlin

KA5

40

120

755

2

Fascia board, running meters

R1

19

95

3,3m

8

Support batten for roof boards, running meters

R2

40

50

3,3m

4

Trims for doors and windows, running meters

I4

19

95

2200

38

Trim for door opening, running meters

I5

19

70

2200

3

Stairs, right side

P1A

34

145

2375

1

Stairs, left side

P1B

34

145

2375

1

Steps for the stairs

P2

34

145

475

7

Handrail for stairs

P3

40

50

2500

2

Middle part for handrail

P4

40

50

150

6

Door type C24

O1

816

1917

1

Side frame, hinge side (right)

O2

45

56

1947

1

Side frame, lock side (left)

O3

45

56

1947

1

Top frame

O4

45

56

890

1

Treshold

O5

40

70

890

1

Communicating door, type O81

O6

790

1890

1

Window, type D

I1

1196

880

3

Window, type E

I2

646

880

1

Window, type A

I3

646

646

1

Threaded rod

T1

2200

5

Accessories bag

T2

Assembling blocks

T3

70

65

250

All measurements approximately. We reserve the right to make technical changes.

ID 7889, Versio 2, Pvm 12/1/2020, Luoman 724

Summary of Contents for 724

Page 1: ...Important Keep the number Guarantee number Controlled by Luoman 724 ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 2: ...ssion is required before beginning construction Receiving and storing the goods Machined logs and other parts have been packed into protective wrapping If the item will not be constructed immediately it should be kept indoors or otherwise well protected until assembly The package should be kept away from the ground in order to avoid absorbing moisture and be stored on a level base Transport defect...

Page 3: ... building is fit for its intended use Constructing this building requires expertise and thorough knowledge concerning the building and construction regulations The builder is expected to comply with good building practices If needed seek advice from experts and construction sector professionals The assembly instructions include a parts list drawings of wall constructions and the required detail dr...

Page 4: ...ructure Doors and windows In principle doors and windows can be added to the building or their places changed Contact the reseller Use an insulator allowing settling when filling the gaps It is not allowed to use polyurethane foam One spare log is included in the delivery This spare log is intended to be used if a log has a machining defect or is otherwise damaged or of the wrong size The spare lo...

Page 5: ...nce Safe long term use of the building requires regular checking possible reparation of the fastenings and inspecting the condition of the parts Pay special attention to the roof construction its covering material doors and windows foundation fastenings the protection against storm as well as surface treatment of any wooden parts Failure to perform regular maintenance can cause damage to the build...

Page 6: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 7: ...indow 1196x880 door 795x1890 window 1196x880 window 646x880 window 1196x880 door 895x1990 Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 8: ...g point 0 00 an extra beam or a supporting point under every floor beam must be added if the load on the floor exceeds 0 8 kN m2 e g 50x150 Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 9: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 10: ...escription Drawn by Luoman Puutuote Oy Date Scale not to scale Overlap of wall from foundations 5mm Note Leave a space in the foundations for the threaded rods if needed ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 11: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale drilling for threaded rod 8mm threaded rod through the wall screw 6x160 ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 12: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 13: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 14: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale drilling for threaded rod 8mm threaded rod through the wall screw 6x160 ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 15: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 16: ...Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale drilling for threaded rod 8mm threaded rod through the wall screw 6x160 ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 17: ...L5 L6 L6 Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 18: ...L8 L7 Position of the supporting post of the roof purlin Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 19: ...40x50 19x95 19x95 4 5x50 roofing material roof board 19x95 19x95 Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale not included ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 20: ...not to scale Beam shoe fixed with 5x40mm anchor screws Floor board 28mm fixed with 1 7x45 nails Floor beams 40x145 c c600 Floor beams next to the walls fixed to the logs with 5x80mm screws 8 pcs beam Waterproofing e g bitumen stripe ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 21: ...ct Description Drawn by Luoman Puutuote Oy Date Scale not to scale Settling space 60 70mm insulation Trim fixed with 4x40mm screws to the frame Top frame treshold skirtingg floor board not included ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 22: ...frame insulation not included Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale trim screw 4x40mm ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 23: ... not included Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale frame trim fixed with 4x40mm screws to the frame insulation ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 24: ...Space for settling 60 70MM insulation lK Trim fixed to the frame with 4x40MM screws Top frame ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 25: ...A5 KA5 KA4 KA4 KA3 KA2 KA2 B2 Loft floor beams Beam shoe fixed with 5x40 screws 5x80 5x80 Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 26: ...le parts P4 with 6x90 screws and the steps with 4 5x70 scews Fix the stairs to the wall with sliding brackets and 5x40 screws Project Description Drawn by Luoman Puutuote Oy Date Scale not to scale ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 27: ...1865 7 Log D3 70 135 1000 7 Log E1 F1 70 135 4100 13 Log E2 70 135 350 15 Log E3 70 135 1400 15 Log E4 70 135 630 15 Log E5 70 135 4100 1 Log E6 70 135 1333 2 Log drilled F2 70 135 2450 7 Log drilled F3 70 135 965 7 Gable triangle log drilled D4 70 135 3760 1 Gable triangle log D5 70 135 3506 1 Gable triangle log D6 70 135 2998 1 Gable triangle log D7 70 135 2491 1 Gable triangle log D8 70 135 198...

Page 28: ...t batten for roof boards running meters R2 40 50 3 3m 4 Trims for doors and windows running meters I4 19 95 2200 38 Trim for door opening running meters I5 19 70 2200 3 Stairs right side P1A 34 145 2375 1 Stairs left side P1B 34 145 2375 1 Steps for the stairs P2 34 145 475 7 Handrail for stairs P3 40 50 2500 2 Middle part for handrail P4 40 50 150 6 Door type C24 O1 816 1917 1 Side frame hinge si...

Page 29: ...er log The screws shown in the wall drawings are installed as advised here Drill a starting hole to the log with the drill from the accessories bag according to the measurements and drawings shown here Drill the hole perpendicularly You can drill the holes before you lift the logs in place ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Page 30: ... 150mm 50mm Obey the minimum distances shown in the drawings The holes must be drilled perpendicularly ID 7889 Versio 2 Pvm 12 1 2020 Luoman 724 ...

Reviews: