Electrical Installation - 2 Wire Option

www.Lumishore.com

Lumishore UK Unit 2, Technium 1, Kings Road, Swansea, SA1 8PH, UK  |  +44(0)208 144 1694  |  [email protected]

Electrical Installation - SUPRA i-Connect Hub

The light cables can be extended. Ensure the correct cable gauge is 

used to avoid issues with voltage drop. Follow ABYC recommenda-

tions for no more than 3% voltage drop at 12V, and 10% at 24V. 

Consult a qualifed electrical installer, or contact Lumishore for further 

information. 

Make sure the lights are tested, and working as expected before the 

boat goes back in the water. 

Battery / PSU (12 or 24V DC)

Red 

(+VDC)

Red 

(+VDC)

Black 

(GND)

Fuse

Fuse

Switch

Off

On

Fuse or

Circuit

Breaker

The lights operate in White, Blue, Random Strobe, and Colour Fade 

modes. To change the mode turn the switch OFF / ON (wait a 

second before switching back on).  To reset to White, switch the 

lights off for 5 seconds. The lights will always come on in White 

mode when first switched on. 

 

Plan the cable route prior to instalation. Ensure all cables are suitable 

for marine applications, and correctly rated for the required voltage 

and current. Each light must be 

individually fused

. The cable connec-

tions are:

 

 

 

Red 

12V or 24 V DC

   Black 

Ground

The fuse ratings are: 

12 V DC  

7.5A

   24 

DC 

 4A

An ON / OFF switch should be installed to select the modes of opera-

tion.

All connections must be made waterproof.

Note: This option requires a Lumishore SUPRA i-Connect Hub 

(60-0317) and SUPRA SUPRA i-Connect Hub Switch (60-0318). The 

SUPRA i-Connect Hub is Lumi-Link compatible which allows control 

via certified MFD or iOS connected device - see datasheet for further 

details.

Plan the installation first. Work out where the lights will be mounted. 

Each light connects to the hub using a field installable connector 

(supplied). One hub can power up to 4 lights, and 2 hubs can be 

connected together in one system. The hub should be mounted 

between the lights and the power source. Plan the cable routes, 

including the switch, prior to installation. Ensure all cables are marine 

Note:  Two hubs can be connected together. All they need is power 

connected, and a pre-moulded data cable run between the hubs (see 

connecting multiple hubs section for wiring diagram).

The light and power cables can be extended. Ensure the correct cable 

gauge is used to avoid issues with voltage drop. Follow ABYC recom-

mendations for no more than 3% voltage drop for  12V, and 10% 

voltage drop for 24 V. Consult a qualifed electrical installer, or contact 

Lumishore for further information.

Installing the hub(s):

1. Select a site for the installation of the SUPRA i-Connect Hub(s). This 

should be within reach of the light cables that will be attached to the 

hub(s). The hub(s) should be in a dry, well ventilated area. The hub(s) 

should NOT be mounted in areas prone to flooding or excess heat.

2. The hub(s) should be mounted to a flat surface, with room for 

access to the fuse panel and connectors.

3. Mount the hub(s) as close to the power source as possible. Run the 

power cable to the hub(s) from the power source. 

Use correct cable gauge - 

consult ABYC recomendations 

for MAX 3% voltage drop at 

12V, and max 10% voltage 

drop at 24V.

Warranty

Battery / 

PSU 

12 or 24 V

SUPRA i-Connect

Hub

On/Off

Scene

SUPRA i-Connect Hub Switch

Field Installable 

Connectors (Supplied)